4801-5101 Rev 1-2015
Page
8
of
30
Super Saver XL CE Heater
5. Installation
5.1
Hanging The Heater
Chain Suspension
Cable Suspension
Mount heater with screw hooks and chains so that
back of heater is at least 305 mm (12 inches) from
ceiling and wall. Heater must be a minimum of 500
mm (20 inches) from floor, and located so livestock
and combustible materials are unable to come in
contact with heater or within 3 meters (10 feet) of hot
air discharge (Fig. 1)
If frequent height adjustment is required, use
cables and pulleys as shown in Fig. 2. Main
line cable would be connected to a winch (not
shown).
5.2
Directions For Leveling
Adjust cables or chains as required to level the heater. Use a carpenter's level to check that the
heater is level.
5.3
Installing Dual-Flare Duct
Install Dual-Flare duct (Fig. 3) as shown with sheet metal screws provided. This provides a multi-
directional heat flow that may be set by bending flaps.
5.4
Connecting The Gas Supply
For gas connection (Fig. 4) attach regulator to the Hi-Pressure Line (A) at outside of building.
Connect gas supply line (B) to low pressure end of regulator with special brass coupling. See
Section 1
for LP, natural gas, and LHV natural gas requirements.
Fig. 1
Suspend heater from
ceiling with chains if
heater is to remain fixed.
Fig. 2
Suspend heater with
pulleys and chains if
frequent adjustment
is required.
Fig. 3
Fig. 4
Gas regulator
Hi-Pressure Line
Adjust flap
to direct
heat flow.
Содержание SUPER-SAVER XL SS-225-XL
Страница 28: ...Copyright 2015 by The GSI Group LLC Printed in the USA ...
Страница 29: ......