CTC 380 IC
8
2. Important points
Read and observe this installation and operating manual before
installing and starting the boiler.
2.1. Important points
The following important points must be checked during installation:
• Unpack CTC 380 IC on delivery and check whether the product was not
damaged in transit.
• Any transport damage must be reported to t he supplier (carrier).
• Check whether an overflow line was laid from a possible installed safety valve
to the floor drainage.
• Examine the condition of the chimney, take measures against condensation water
formation.
2.2 Safety instructions
The following safety instructions must be observed when handling, installing and
operating the boiler:
• An unlockable safety valve which corresponds to the applicable norms must be
installed in an enclosed system; please refer to Section
INSTALLATION.
• Ensure that the boiler is disconnected from the mains supply before making
changes.
• The boiler and the regulation equipment must not be rinsed with water.
• The smoke duct and the boiler room duct for ventilation must not be
blocked.
• Check whether the bruner and its oil duct are leakproof.
• The boiler's switch must be deactivated when the oil burner is swivelled out,
e.g. during cleaning or maintenance.
2.3 General installation conditions
Smooth operation of the boiler series CTC 380 IC and the manufacturer's warranty
are only ensured if installation and operation are performed in compliance with these
instructions and the boiler is regularly cleaned.
Faults and damages which are caused by improper and violent damage do not release
the manufacturer from this warranty obligation.
Please hand over these instructions to your customer after installation.
Regulations:
The boiler and the heating system must be installed in
compliance with the applicable standards and construction
regulations by respective specialist companies only.
Содержание CTC 380 IC
Страница 2: ......
Страница 3: ...CTC 380 IC Models 17 19 24 29 162 105 11 1 2013 05 21...
Страница 4: ......
Страница 6: ...CTC 380 IC 6...
Страница 45: ...CTC 380 IC 45...
Страница 46: ......
Страница 52: ...7 4 6 5 3 16 18 17 21 19 22 20 14 15 7 5 6 8 9 3 4 1 2 10 23 6 2 TECHNICAL DATA 2 2 Description...
Страница 67: ...21 Boiler 8 ELECTRICAL EQUIPMENT 380IC 17 19 8 1 Wiring diagram LMO14 113...
Страница 69: ...23 Boiler 9 ELECTRICAL EQUIPMENT 380IC 24 29 9 1 Wiring diagram SATRONIC TF 834E TF 834E 2 TF834E 3...
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 161 421 50 10 01...