F
G
12
Note:
* When servicing or replacing components that affect combustion,
analyses and soot tests must be carried out on the installation.
5. BURNER SERVICING
5.1.3 Oil pump replacement
1. Switch off the power at the main switch and disconnect the Eurostecker
2. Disconnect the oil hoses from the oil pump.
3.
Remove the screw securing the burner to the fl ange on the boiler.
Draw out the burner head. Take care as this can become very hot.
4. Remove the solenoid cable from the pump.
5. Remove the connecting pipe (G) from the pump.
6. Undo the screws (F) and pull out the oil pump.
7. Install the oil pump in the burner. Tighten the screws and attach the
connecting pipe (G). (It is important that the splines engage the pump
coupling correctly.)
8. Connect the oil hoses. (For conversions from one- and two-pipe
systems refer to the Pump instructions.)
9. Assemble the burner and install it in the boiler.
10. Connect the Eurostecker and switch on the power at the main switch.
11. Start the burner, purge the pump, adjust to correct pressure and
check combustion.
5.1.4 Fan motor replacement
1. Switch off the power at the main switch and disconnect the Eurostecker
from the burner.
2.
Remove the screw securing the burner to the fl ange on the boiler.
Draw out the burner head. Take care as this can become very hot.
3. Loosen the blast tube and remove it.
4. Remove the brake plate/electrode packet. Loosen and remove the
front section.
5. Remove the electrical connection from the motor.
6. Remove the electrical box retaining screw.
7. Remove the cable conduit entry to the ignition electrodes and the
preheater (where fi tted) and remove the photocell cable from the mo-
tor fl ange.
8.
Undo the screws (H) to the motor fl ange, 5 pcs.
9. Lift away the motor.
10. Remove the drive coupling end from the motor shaft, loosen and
remove the fan wheel.
11. Install the fan wheel on the new motor, tighten the locking screw. The
fan wheel must be installed in the bottom position toward the motor
shaft. Install the drive coupling end.
12.
Align and fi t the motor fl ange to the fan housing. Pay attention to the
drive coupling so that it does not fall out, and also that it aligns
correctly in the drive coupling end of the motor and pump.
13.
Bolt the motor fl ange and fan housing together. Tighten the screws
diagonally, and do not tighten hard one at a time. This is in order to
ensure the fan housing and the motor fl ange assume the correct
relative positions.
14. Place the cable conduit entry and the photocell cable in position.
15. Screw the electrical console in place.
16. Connect the motor wiring.
17. Assemble the burner and install it in the boiler.
18. Connect the Eurostecker and switch on the power at the main switch.
19. Start the burner and check the combustion*.
Содержание CTC 380 IC
Страница 2: ......
Страница 3: ...CTC 380 IC Models 17 19 24 29 162 105 11 1 2013 05 21...
Страница 4: ......
Страница 6: ...CTC 380 IC 6...
Страница 45: ...CTC 380 IC 45...
Страница 46: ......
Страница 52: ...7 4 6 5 3 16 18 17 21 19 22 20 14 15 7 5 6 8 9 3 4 1 2 10 23 6 2 TECHNICAL DATA 2 2 Description...
Страница 67: ...21 Boiler 8 ELECTRICAL EQUIPMENT 380IC 17 19 8 1 Wiring diagram LMO14 113...
Страница 69: ...23 Boiler 9 ELECTRICAL EQUIPMENT 380IC 24 29 9 1 Wiring diagram SATRONIC TF 834E TF 834E 2 TF834E 3...
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 161 421 50 10 01...