5
-Pre-Installation Check List-
A water test should always be performed
in order to determine total water hardness (in gpg) and total dissolved iron (in
parts per million - ppm). This is critical for proper equipment selection, sizing and for determining the program for regen-
eration frequency. If heavy concentrations of iron (above 5 ppm), iron coloration, iron bacteria or sediment are present,
filtration prior to the softener will most generally be required. Certain states may require a licensed plumber for installation.
Note:
Flexible water supply connectors and flexible drain line tubing may not be allowed in you locale. Please check
with local plumbing code officials prior to installation.
Installation Requirements
• A level floor position ahead of piping into water heater.
• Unit must be installed at least 10’ ahead of the inlet to a water heater to prevent damage due to back-up of hot water.
• DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur!
(See Installation Diagrams for proper placement and plumbing connections.)
• A level floor position ahead of piping into water heater.
• Unit must be installed at least 10’ ahead of the inlet to a water heater to prevent damage due to back-up of hot water.
• DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur!
(See Installation Diagrams for proper placement and plumbing connections.)
-Major System Components-
1.
Brine Tank
- This tank holds the salt that is added to the softener. This salt is dissolved with water to form a brine solution
used in the softener regeneration process.
2.
Resin Tank
- This tank contains the ion exchange resin media. Water flows through the resin tank under pressure to
come into contact with the resin for water softening.
3.
Control Valve
- The valve directs water through the resin tank for water softening and controls the flow of water / brine
for the regeneration process.
Installation
Содержание Optimizr MSF32-10D-S2
Страница 1: ...Signature 2 Signature 3 Optimizr Manual Installation Operation Manual...
Страница 18: ...18 Valve Body Assembly Signature 2...
Страница 21: ...21 2 9 1 3 13 14 12 16 17 18 19 21 22 10 11 4 5 6 7 6A 8 15 20 Valve Body Assembly Signature 3...
Страница 30: ...30...
Страница 31: ...31...