23
FIGURE 9.4: TWO-PIPE LIFT SYSTEM
X Wiring
WARNING
• All wiring and grounding must be done in accordance with the authority having jurisdiction
or, in the absence of such requirements, with the
National Electrical Code (ANSI/NFPA 70).
• Disconnect electrical power to the boiler and heating system before servicing. Positively
assure that no voltage is present. Lock electrical boxes to prevent someone from
inadvertently restoring power before the heating system is safe to operate.
• Never defeat or jump out safety devices.
• Protect each boiler circuit with a properly sized over-current protection device.
• Make electrical connections carefully according to the boiler’s wiring diagram and
instructions.
• Wire additional field supplied safety limits, such as low water cutoffs and temperature limit
devices, in series with the 120V circuit used to power the boiler. Do not alter the boiler’s
factory wiring when adding an additional limit device.
1)
120 Volt Wiring - The boiler should be provided with its own 15A branch circuit with fused disconnect. 120VAC power con
-
nections are made inside the Hydrolevel 3250-Plus hot water boiler control as follows (also see Figures. 10.0 and 10.1):
•
Hot (“black”) - Terminal “L1”
•
Neutral (“white”) - Terminal “L2”
•
Ground (“green” or bare) - Ground screw on case of 3250-Plus.
The heating circulator is factory wired to the 3250-Plus circulator connections or the boiler is provided with a flexible conduit
“whip” that is to be wired to the 3250-Plus circulator connections. If the circulator is not already wired to the control, connect
it as follows:
•
Circulator “Hot” - Black wire lead from “whip” to C1
•
Circulator “Neutral” - White wire lead from “whip” to C2
Содержание TWZ Series
Страница 2: ......
Страница 10: ...8 FIGURE 4 1 INSTALLATION OVER A COMBUSTIBLE FLOOR FIGURE 4 0 CLEARANCES...
Страница 27: ...25 FIGURE 10 0 CONNECTIONS DIAGRAM BOILERS WITH OR LESS TANKLESS HEATER...
Страница 28: ...26 FIGURE 10 1 CONNECTIONS DIAGRAM FOR BURNER PRIMARY CONTROLS Carlin 40200 Beckett 7505 Riello 530SE...
Страница 47: ...45...
Страница 49: ...47...
Страница 50: ...48 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 51: ...49 Notes...