26
FIGURE 10.2: ONE-PIPE LIFT SYSTEM
7) Attach required piping between burner fuel pump and fuel oil storage tank. Install one fuel shut-off valve near the storage
tank and second fuel shut-off valve near the oil burner fuel pump. Use heavy wall copper tubing in a continuous run. On
two-pipe systems, the return line should terminate 3” - 4” above suction line depth within the storage tank. Refer to the
pump manufacturer’s instructions for tube sizing information.
8) All systems require an oil filter. For boilers having an input less than 1.00 GPH, the use of a Garber cartridge type filter is
recommended.
FIGURE 10.3: TWO-PIPE GRAVITY FEED SYSTEM
Содержание TWB Series
Страница 2: ......
Страница 12: ...10 FIGURE 4 1 FIELD INSTALLATION OF FLUE BAFFLES...
Страница 18: ...16 FIGURE 6 4 ALLAIR FROM OUTDOORS USING HORIZONTAL DUCTS INTO BOILER ROOM...
Страница 23: ...21 FIGURE 8 3 BOILER BYPASS PIPING FIGURE 8 2 INDIRECT WATER HEATER BOILER SIDE PIPING...
Страница 31: ...29 FIGURE 11 0 CONNECTIONS DIAGRAM BOILERS WITH OR LESS TANKLESS HEATER...
Страница 32: ...30 FIGURE 11 1 CONNECTIONS DIAGRAM FOR BURNER PRIMARY CONTROLS Carlin 40200 Beckett 7505 Riello 530SE...
Страница 51: ...49...
Страница 53: ...51...
Страница 54: ...52 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 55: ...53 Notes...