SOLUTION:
The completed Worksheet 1 for this example is shown in Figure 2. The Adjusted Peak Hour
Demand is 195 Gallons per Hour. From Table 1 we see that a MT050G is required.
Use Figure 4b to determine the boiler size required to achieve a 195 GPH First Hour Rating
with an MT050G. From Figure 4b we see that a boiler output of approximately 102,000 BTU/hr
is required. Install a boiler with a 102,000 BTU/hr output.
(a)
(b)
(c)
(d)
Shower:
(3 GPM Head)
21.0
X
=
(5 GPM Head)
35.0
X
=
(7 GPM Head)
49.0
X
=
Bath (30 Gal. Tub)
21.0
X
=
Vanity
2.8
X
=
Clothes Washer
48.0
X
=
Dishwasher
15.0
X
=
=
=
=
BTU/hr
=
BTU/hr
1) Boiler Output Required For Maxi-Therm
2)
Boiler Output Required for Space Heating
WORKSHEET 1: SINGLE FAMILY RESIDENCE
Select a boiler with an output equal to (1) or (2), whichever is GREATER
TOTAL
NUMBER OF
FIXTURES
135F WATER PER
TYPE OF
FIXTURE (Gal/hr)
Peak Hour Demand = Total Column (d)
Peak Hour Demand X 1.20 = Adjusted Peak Demand
=
Kitchen Sink or
Utility Tub
135F WATER
PER FIXTURE
(Gal/hr)
10.0
X
FIXTURE
DESCRIPTION
7
Содержание MAXI-THERM MT040G
Страница 4: ...3 Figure 1b MT079G and MT100G General Configuration Figure 1a MT040G and MT050G General Configuration...
Страница 22: ...Figure 6 Boiler Side Piping Using Circulator Zones Figure 7 Boiler Side Piping Using Zone Valves 2 Way 21...
Страница 28: ...Figure 12 Basic Domestic Side Piping Figure 13 Domestic Side Piping Using a Mixing Valve 27...
Страница 30: ...Figure 15 Domestic Side Piping for Multiple Maxi Therms 29...
Страница 32: ...Figure 16 Non Priority Circulator Zoning Using Honeywell R845a s Figure17 PriorityCirculatorZoning 31...