
2.
6
Safety Informa on
Electrical Safety
Other safety aspects
Policy of equipment requirements
Mechanical safety
Chapter 3: Installa on Site and Environmental Requirements
3.1
Space requirement
3.2
Flooring & hallway access
3.3
Environmental requirement
Table 3-1: System equipment size and installa on space required(Includes loading table+output bridge)
W
L
Device Model
Equipment Size
W
(
m
)
TP26H/TP26G+
TP36H/TP36G+
TP46H/TP46G+
TP60H/TP60G+
TP72H/TP72G+
1.4
1.7
1.9
2.3
2.7
2.1
2.1
2.7
2.8
4
3.4
3.7
3.9
4.3
4.7
4.1
4.1
4.7
4.8
6
Equipment Size
L
(
m
)
Installa on Space
W
(
m
)
Installa on Space
L
(
m
)
Table 3-1
Chapter 2: Overview
Equipment must be grounded effec vely;
To protect the equipment and personal safety, it is recommended to install indoor lightning arres ng rod;
All maintenance work on the equipment must be carried out with the power off
;
When the equipment is working, do not touch the moving parts of the machine with your hands or fingers.
Only under the circumstances necessary to dismantle the device casing;
Be a en on to the machinery opera on, always wear gloves, tools and parts must be placed in an orderly
manner
;
Do not perform any maintenance or modifica ons to the equipment system that is not authorized by CRON.
Do not place any foreign objects on the device;
In non-emergency situa ons, it is strictly prohibited to press the emergency stop bu on;
In the opera on of mechanical parts, always wear gloves, so as to avoid rus ng parts; tools and parts should be
placed in order;
Avoid overhead collision during equipment opera on.
This device is not intended to be used in an explosive or poten ally explosive atmosphere.
Fireworks is prohibited near the occasion of this device;
Prevent water or other liquids from flowing into the interior of the device;
Debris, scrap or residue generated from the use of this equipment must be handled in accordance with the laws
and regula ons of the hazardous material management authority in the country / region in which it is used.
To ensure that customer’s installa on site, environment and condi ons, are able to meet and comply to the
equipment opera onal requirements.
Refer to Table 3-1, given the size of the machine and consider the space needed, minimum distance between
wall and machine is 100cm, sizes of the room(space) needed for the machine installa on can be determined. It
is also advisable to reserve some room space close to the installed machine for placement of plates and media
too.
Doors and corridors at the installa on site must be wide enough ( 145cm) so that the machine can be
pushed into the room.Floor level should be maintained at ± 4mm. If installa on to be done above ground floor,
this requires an industrial elevator that have can load more than 2000kg. A er the machine is in place, the
machine requires leveling by using a level gauge.
Working room temperature: 18°C ---- 28°C
Environment humidity: 40% ---- 60%, Non-condensing
Air quality: should meet interna onal quality standards, that is, API value
is less than or equal to 100;
Other installa ons for indoor: Air-condi on, Dehumidifier/humidifier, air
purifier.
11
10
SIMPLE AND DIRECT
丨
STEADY
丨
MAJOR
SIMPLE AND DIRECT
丨
STEADY
丨
MAJOR
Содержание TP26G+
Страница 26: ...Chapter 10 Appendix 10 1 Wiring Diagram 51 50 SIMPLE AND DIRECT STEADY MAJOR SIMPLE AND DIRECT STEADY MAJOR...
Страница 27: ...Chapter 10 Appendix 53 52 SIMPLE AND DIRECT STEADY MAJOR SIMPLE AND DIRECT STEADY MAJOR...
Страница 28: ...Chapter 10 Appendix...
Страница 29: ...52 53 Chapter 10 Appendix SIMPLE AND DIRECT STEADY MAJOR SIMPLE AND DIRECT STEADY MAJOR...
Страница 30: ...54 55 Chapter 10 Appendix SIMPLE AND DIRECT STEADY MAJOR SIMPLE AND DIRECT STEADY MAJOR...