background image

CRL ESK1/ESP1 - ELECTRIC STRIKE KEEPER FOR SINGLE DOORS

10

crlaurence.com   |   usalum.com

*

THIS IS REQUIRED ONLY IF:

  1.  Electric Strike is replaced.
  2.  The latch sensor gives a false reading when the door is pushed out while secured.

To Adjust: 

  A)  Remove the      (2) 5/16-18 x 3/4" SHCS. 
  B)  Remove the Strike from the header.

 (Fig.10)

 

  C)  Loosen the      (2) 1/4"-20 x 1/2" SHCS. 
  D)  Apply pressure to the Strike Keeper to create a gap. 

(Fig.11)

 

  E)  Insert the 

ESP040

 Electric Offset Jig while holding the Strike Keeper. 

(Fig.12)

  F)  Push and hold the Strike Keeper in against the Jig and re-tighten the  
   

      (2) 1/4"-20 x 1/2" SHCS. 

(Fig.13)

  G)  Remove the 

ESP040 

Electric Offset Jig. 

(Fig.14)

 

  H)  Install the Electric Strike Assembly using the       (2) 5/16-18 x 3/4" SHCS. 

C

C

A

A

FIG. 14

FIG. 13

FIG. 11

FIG. 12

Strike 

Keeper

ESP040  

Electric  

Offset Jig 

ordered 

separately.  

Used only 

for the ESP 

Strikes

Strike 

Keeper

(2) 1/4"-20 x 1/2" 

SHCS

Strike 

Keeper

FIG. 10

(2) 5/16"-18 x 3/4" 

SHCS

C

(2) 1/4"-20 x 1/2" 

SHCS

Strike 

Keeper

C

A

ESP040  

Electric  

Offset Jig 

ordered 

separately.  

Used only 

for the ESP 

Strikes

ESP040  

Electric  

Offset Jig 

ordered 

separately.  

Used only 

for the ESP 

Strikes

ELECTRIC STRIKE ATTACHMENT (CONTINUED)

ELECTRIC STRIKE ADJUSTMENT

Содержание ESK1

Страница 1: ...TALLATION INSTRUCTIONS CRL ESK1 ESP1 ELECTRIC STRIKE KEEPER FOR SINGLE DOORS ALUMINUM Phone 800 421 6144 Fax 800 587 7501 crlaurence com usalum com crl arch com NOTE Sensor feature available on ESP St...

Страница 2: ...ON 08 11 VOLTAGE AND WIRING 08 ELECTRIC STRIKE ATTACHMENT 09 ELECTRIC STRIKE ADJUSTMENT 10 RE ATTACH STRIKE COVER AND MAKE FINAL ADJUSTMENTS 11 The rapidly changing technology within the architectural...

Страница 3: ...i A156 3 Exit Devices iii A156 18 Materials and Finishes b Americans with Disabilities Act A D A c American Society for Testing and Materials ASTM d National Fire Protection Association NFPA 101 e Und...

Страница 4: ...1 SHCS Stop Screw for Glass Mount Doors Bumper Sold Separately 2 BMPRBR Rubber Bumper for Strike D E FASTENERS AND PARTS LIST CALL OUT QTY FASTENER FASTENER DESCRIPTION PART USED WITH PART NUMBER 2 5...

Страница 5: ...TACHED TEMPLATE INTERIOR FIG 1 Drill and Tap 5 16 18 x 3 4 UNC 2 Places Centerline of Pivot 4 1 8 104 8 to Leading Edge Swing 3 This Side 4 1 8 104 8 to Leading Edge Swing 4 This Side 1 25 4 on 1 2 12...

Страница 6: ...m NOT TO SCALE HEADER PREPARATION CONTINUED Interior Edge of Header Use Template from Box Drill and Tap for a 2 5 16 18 x 3 4 SHCS REINSTALL THE PREPARED HEADER AND CONTINUE WITH THE ELECTRIC STRIKE I...

Страница 7: ...p 2 F O G DIRECT TO GLASS MOUNTING FIG 5 Header FIG 6 NOTE Face of the Strike Keeper MUST be set at 87 degrees as illustrated in Figure 6 To adjust the Strike refer to page 10 Electric Wires Header Fa...

Страница 8: ...Before installing the strike make the necessary wire connections Refer to the table below in Fig 7 for ESK ESP strikes for latch deadbolt and monitor on ESP strikes only 2 When you are installing the...

Страница 9: ...SHCS A ELECTRIC STRIKE ATTACHMENT CONTINUED 1 Fasten the Electric Strike to the header using 2 5 16 18 x 3 4 SHCS Fig 8 2 Check the horizontal alignment Make sure that the centerline of the latch bol...

Страница 10: ...12 F Push and hold the Strike Keeper in against the Jig and re tighten the 2 1 4 20 x 1 2 SHCS Fig 13 G Remove the ESP040 Electric Offset Jig Fig 14 H Install the Electric Strike Assembly using the 2...

Страница 11: ...against the rubber stop pads the retractable bolt should automatically move upward to engage the Strike 3 If it does NOT engage the door stops should be adjusted inward Do not overtighten This can cau...

Отзывы: