52
© 2014 All rights reserved. Data subject to change without notice.
GEM-II - Operation Manual
Rev. E | 2014.10
Step 2:
Move jumper on J6 to position-3 and move jumper on J7 to position-3. The audible alarm beeps
once for confirmation. The system is now starting the zero calibration stabilization time (30
seconds).
Step 3:
The audible will beep twice when the calibration begins. Leave the zero air flowing over the
sensor until the GEM audible beeps three times indicating the procedure is finished (1 minute).
Step 4:
Move jumpers from J6 & J7 back to their respective resting positions and remove the zero air or
Nitrogen.
8.6.3 Calibrating the Span Gas (remote catalytic or SS sensor)
Step 1:
Attach regulator to cylinder of span gas.
Step 2:
Attach flow adapter and open regulator valve fully (fixed flow regulators only) allowing span gas
to flow over sensor.
Step 3:
Move the jumper on J6 to position-3 and move jumper on J7 to position-4. The audible alarm
“beeps” once for confirmation. The system is now starting the span calibration stabilization time
(30 seconds).
Step 4:
The audible will beep twice when the calibration begins. Leave the span gas flowing over the
sensor until the GEM audible beeps three times indicating the procedure is finished (2 minutes).
Move jumpers from J6 & J7 back to their respective resting positions and remove the span gas.
Содержание GEM-II
Страница 1: ...Operation Manual www critical environment com GEM IISelf Contained Gas Detector Rev E 2014 10...
Страница 58: ...58 2014 All rights reserved Data subject to change without notice GEM II Operation Manual Rev E 2014 10 NOTES...
Страница 59: ...2014 All rights reserved Data subject to change without notice 59 Rev E 2014 10 GEM II Operation Manual NOTES...