6.
Take up any slack in the line by pulling the free end of the line as shown in
fig. 5
.
Fig.5
7.
Transfer the load into the
Smartline X.
This is done in two different ways depending
on the type of fall protection equipment used. It is important that users are trained
and supervised in these method.
Person hanging in adjustable fall protection equipment
After the line between the anchor and the person to be rescued is tightened as much
as possible
fig.5
, adjust the loaded fall protection equipment so that the person is
lowered until his weight is fully onto the
Smartline X.
Then the other fall protection
equipment can be removed and the descent started.
Person hanging in none adjustable fall protection equipment
In such situations the
Smartline X
has to be used as a pulley system to transfer the
load from the fall protection equipment to the
Smartline X.
This is done by making a
loop of the line below the descender and threading it through the carabiner or
schackle attached to the harness. By pulling the line as showed in
fig.6
the person
can be lifted and the load transferred from the fall protection equipment onto the
Smartline X
. The person only needs to be lifted a small distance before the fall
protection equipment can be removed.
Содержание RESQ Smartline X
Страница 1: ...EN I N S T R U C T I O N S F O R U S E I N S P E C T I O N C A R D F O R Smartline X EN341 CLASS D...
Страница 2: ......
Страница 3: ...Smartline X CE NOTIFIED BODY 0200 REVISION NUMBER 001 2017 10 02 EN...
Страница 4: ......
Страница 9: ...CRESTO Smartline X EDITION 001 2017 10 02 UK version Master 5 Fig 1 1 5 2 8 7 3 4...
Страница 10: ......