Assembly
Pine Skybox
19690-100 Rev J (06-16)
© Copyright 2005, Creative Playthings
Page 19
ASSeMbly InStRuCtIonS
illustration #37
illustration #36
SteP 24 - Restore Sandbox Seat:
Re-fasten the Sandbox Seat that was removed in step one.
use the screws that originally held the Sandbox Seat.
SteP 25 - Hole Caps:
make a final check and make sure that all the bolts and
screws have been tightened.
Locate the 1" hole Caps in the hardware bag. install hole
Caps into all the counter-bored holes to cover and protect
the hardware.
Special Instructions: Mounting the Skybox to a Gym with Clubhouse or Play floor
4-5/8"
drill pilot hole
in center
Gym Sandbox
end
Skybox
Sandbox Side
Cut the Sandbox Sides
Cut 4-5/8" from the length of the Sandbox Sides (bb) of the
Skybox. drill a 3/16" diameter pilot hole 2" deep into the cen-
ter of the trimmed end of each Sandbox Side.
fasten Sandbox Sides to Gym Sandbox end
drill two 1" diameter holes 1/2" deep into the Sandbox end
of the Gym, 11/16" from the adjacent Corner Posts. in the
center of these holes, drill 5/16" diameter holes through the
Sandbox end. The counter-sink holes should be on the in-
side of the gym. it may help to mark the holes first and re-
move the Gym Sandbox end before drilling
Line up the Sandbox Sides to the holes in the Sandbox end.
Fasten using 5/16 x 3" Lag Screws and 5/16 Flat Washers.
Continue installation of both Skybox and Clubhouse (or Play
Floor) as shown in the respective manuals. if installing a
Clubhouse, see the special instructions at the bottom of the
next page.
When mounting the Skybox to a gym that will have a Clubhouse or Play Floor, the Skybox sandbox must be altered.