REF: JC102 - JUNGLE CLIMBER midi
pg 16 of 46
Instal Assembly Instructions
Attach MT4 to VT8 timber
Using M12 x 290* CUP SQUARE BOLTS / ‘NYLOCS’ M12 / Covered end cap R60 / 120 Distance pieces
ENSURE the positioning of the MT4 is correct
The MT4 timber is bolted through 8th onto the VT8 timber CIRCLED RED BELOW (from the LEFT)
MT4 TIMBER positioned
LEVEL
Dimension shown is from FGL
(Finished ground level)
10
11
USE CLAMP
USE CLAMP
MT4
NOTE:
ALL HOLES ARE PRE-DRILLED IN THE MT4 timber
VT2 and VT9 will need to be DRILLED
CLAMP the OUTER ENDS of the MT4 timber to VT2 and VT9 timbers
VT2
VT2
VT8
VT9
VT9
MT4