REF: JC102 - JUNGLE CLIMBER midi
pg 26 of 46
Instal Assembly Instructions
MARK / CLAMP / DRILL / ATTACH
Follow the STEPS A / B / C / D below
29
MARK / CLAMP / DRLL / ATTACH
A - Use the ‘TIMBER MARKER GUIDE’ to mark the MT2 and VT8
Timbers
Mark a line around the MT2 timber - 855mm from the end as shown above / Mark a line around the VT8 timber - 205mm from the TOP OF THE TIM-
BER
B - CLAMP the top of the AT4 timber to the VT8 Timber
REMEMBER to use DISTANCE PIECES to ensure the hole is positioned correctly
C - DRILL the MT2 timber using the hole in the AT4 as a guide
REMEMBER to use DISTANCE PIECES to ensure the hole is positioned correctly
D - ATTACH using
M12 x 290* CUP SQUARE BOLTS / ‘NYLOCS’ M12 / Covered end cap R60 / 120 Distance pieces
AT4
MT2
VT8