NOTE:
There is a remaining hole in the MT5 -
CIRCLED RED BELOW
There is a remaining hole in the VT2 /
VT7 - CIRCLED RED BELOW & RIGHT
(both going in the opposite direction)
MT5
REF: JC102 - JUNGLE CLIMBER midi
pg 15 of 46
Instal Assembly Instructions
Position the VT2 / VT7 / VT8 timbers
VERTICAL TIMBERS (VT) are CHAMFERED at one end only - ENSURE THIS END IS NOT IN THE GROUND
Attach MT2 to VT2 / VT7 timbers
Using M12 x 290* CUP SQUARE BOLTS / ‘NYLOCS’ M12 / Covered end cap R60 / 120 Distance pieces
8
9
VT2
VT2
VT8
VT7
VT7
VT8