Barnes Control panel Part No.
Number of pumps operated by control panel
NOTE: At no time should holes made in top of control panel, unless proper sealing devices are utillzed.
Control panel manufactured by others
Company Name
Model No.
Short
circuit
protection
Type
Number and size of short circuit device(s)
Amp rating
Overload
type
Amp
rating
Do protective devices comply with pump and motor amp rating?
Are all connections tight?
Is the interior of the panel dry?
Electrical Readings:
Single phase:
Voltage supply at panel line connection, Pump Off, L1, L2
Voltage supply at panel line connection, Pump On, L1, L2
Amperage: Load connection, Pump On, L1
L2
Three phase:
Voltage supply at panel line connection, Pump Off, L1, L2
L2 - L3
L3 - L1
Voltage supply at panel line connection, Pump On, L1, L2
L2 - L3
L3 - L1
Amperage: Load connection, Pump On, L1
L2
L3
Final Check:
Is pump seated on discharge properly?
Check for leaks?
Does check valves operate properly?
Flow; Does station appear to operate at proper rate?
Pump down time
Noise Level: High
Medium
Low
Comments:
Manuals:
Has operator received pump instructions and parts manuals?
Has operator received electrical control panel diagram?
Has operator been briefed on Warranty?
Address of local Barnes representative/Distributor:
I have received the above information (Name of Operator):
Name of Company:
Date:
I Certify this report to be accurate (Name of Start-Up Person)
Employed By:
Date:
Date and Time of Start-Up
Present at Start-Up:
(
)
Engineer:
(
)
Operator:
(
)
Contractor:
(
)
Other:
Содержание DGV2042
Страница 12: ...12 FIGURE 8 ...
Страница 13: ...13 FIGURE 9 ...