![COX CXO300 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/cox/cxo300/cxo300_installation-manual_2674296022.webp)
22
CXO300
INSTALLATION MANUAL
5.0 RIGGING INSTALLATION
5.0
RIGGING INSTALLATION
Figure 5.2e. CXO300 quad installation schematic
1 -
Vessel Busbar
2 -
Fuse box
3 -
Fuel Level
4 -
Connect to Battery Breaker
via a 10amp fuse
5 -
Victon Energy DC-DC
Converter
6 -
Vessel Battery Integration
5.2.2
Victron Energy DC-DC Converter Integration
The voltage regulator must be integrated into the ECU power harness 036484 and as near
as possible to the outboard battery switch with a ground link fitted between the input and
output ground cables.
The voltage regulator needs to be set up as a constant power source and to output a
constant 12.5-12.8V. This can be done by turning the adjustment screw to increase /
decrease the voltage or via Bluetooth using the Victron Energy App. The voltage should be
verified using the EST service tool – Parameter view or the GDU.
Ensure the unit is secured mounted vertically to a non-flammable surface, with the power
terminals facing downwards. Observe a minimum clearance of 10cm under and above the
product for optimal cooling.
Содержание CXO300
Страница 1: ...INSTALLATION GUIDE CXO300 designed for purpose coxmarine com ...
Страница 2: ......