background image

DYNA-CUT

15

SETTING UP THE PAPER PATH

1. Raise the elevator all the way up with paper loaded.
2. Press the feed roller release button on the control 

panel

3. Slide the first page forward until it is just entering 

the marble rack. 

4. Adjust paper stack guilds by loosening them then 

slide both while keeping them tight to the paper 
stack. Adjust the whole stack so that the first page 

about an 1/8” from the alignment ledge. 

5. Move first page back and press the feed roller 

release button. 

6. Run a test sheet if you need to adjust your side 

margin make your adjustment then restart at step 
one. 

At the start of a new run you will want to align the 
feeder closely with the marble rack in order to minimize 
skew. To due so follow the instructions below. 

Содержание Dyna-Cut

Страница 1: ...DYNA CUT MANUAL Martin Yale Industries LLC 251 Wedcor Avenue Wabash Indiana 46992 226600 563 0621 Fax 260 563 www martinyale com...

Страница 2: ...ut 10 Installing a Flexible Die 10 Removing a Flexible Die 10 Delivery Tray Installation 11 Delivery Tray Sensor Setup 12 Setting Up the Automatic Feeder 13 Loading the Feeder 13 Setting the Air Chann...

Страница 3: ...C Circuit Protection 20 AMP Circuit Breaker NOTE Older buildings overloaded lines and bad grounds can affect the operation of your Dyna Cut A dedicated line is best NOTE The Dyna Cut is capable of han...

Страница 4: ...line DO NOT use with line splitting surge protector DURING USE Keep fingers and hands away from all rotating parts Keep cords clear of moving parts AFTER USE Turn off machine at the power switch then...

Страница 5: ...on this machine are located on the operator side frame and have the perf shaft and exit shaft through them There are also 2 bushings located on the feed drive shaft To oil these bronze bushings run t...

Страница 6: ...DYNA CUT 6 COMPONENT IDENTIFICATION...

Страница 7: ...creen saver that will turn the display off if the machine is not touched within 30 minutes The power light will stay illuminated letting you know the machine is still on COUNT LOGO AND SERVICE ACCESS...

Страница 8: ...uum system is triggered Up and Down arrows will raise and lower the elevator while the button is pushed Elevator Stop will stop the elevator if auto up has been pushed TRANSPORT MOTOR CONTROLS Pressin...

Страница 9: ...use To adjust the side margins of the paper use the margin adjust knob This will horizontally shift the paper on the registration table Turning the knob in the decrease margin direction will make the...

Страница 10: ...hand this will pull the die onto the magnetic cylinder once it is fully on the cylinder in sure that the lines on the front and rear of the die line up this will show if there is any skew on the die i...

Страница 11: ...commended to be installed by two people although it can be done with one Locate the exit support shaft of the machine Install the hooks on the delivery tray to the cuts outs show on the shaft below no...

Страница 12: ...econds Then use either button to cycle through the menu Cycle until the display reads out then press both buttons at the same time The display will now read Lo or do Lo Stands for Light Operate and do...

Страница 13: ...load making sure the paper is pushed to front of the duct wall and pushed to the right paper stop 4 Position the left side paper stop according to the paper size flush against the paper stack Place t...

Страница 14: ...ore being pulled up to the vacuum belt SETTING TABLE HEIGHT AND SETTING 1 Clockwise rotation will decrease the distance of the sensor relative to the paper Fanned out paper is spread out more 2 Anticl...

Страница 15: ...m then slide both while keeping them tight to the paper stack Adjust the whole stack so that the first page about an 1 8 from the alignment ledge 5 Move first page back and press the feed roller relea...

Страница 16: ...die on 3 Insure that the vertical marks on the die line up to verify the die is on straight 4 Set the pressure on the cylinders by adjusting the hydro jacks on top of the machine 5 Set the pressure t...

Страница 17: ...s 2 Line up diverter fingers with channels in the die 3 Set the diverter bar into slots and tighten set screws 4 Run single sheet to check position of diverters and insure proper scrap diversion 5 If...

Страница 18: ...ck neatly you need to adjust the speed and plastic wheel placement 2 The plastic wheels need to be set so that the cut material is hitting the wheel at the same time as it is coming in contact with th...

Отзывы: