COTES C30
OPERATING AND SERVICE HANDBOOK
page 26/48
Connections needed
– ductwork
The regeneration air must be led to and taken from the outdoors. The ductwork must always be
insulated from and to the cold storage. Such insulation is not included when purchasing a C30C
dehumidifier.
If this draining downwards is not possible, drill a ø6mm hole in the lowest part of the duct, so that any
accumulated water can drain away.
A damper for adjusting the regeneration air flow must be installed on the outlet in order to adjust the
regeneration air flow. If not, the regeneration air flow will
– in most cases – be too high, making it
impossible to reach the desired temperature for the regeneration air and thus making the unit less
efficient. Use a standardised tool for measuring the air flow according to specifications from page 16.
NOTE
A 30-minute timer is activated when the main switch is turned on.
NOTE
The regeneration air inlet and outlet ductwork must be insulated at all times within the cold
store. Furthermore, the external heater, filter frame and electrical box must be installed
according to specifications.
Содержание C30C
Страница 2: ...COTES C30 OPERATING AND SERVICE HANDBOOK page 2 48 COTES COM ...
Страница 4: ...COTES C30 OPERATING AND SERVICE HANDBOOK page 4 48 ...
Страница 19: ...COTES C30 OPERATING AND SERVICE HANDBOOK page 19 48 Spare parts C30E C30C dehumidifier ...
Страница 39: ...COTES C30 OPERATING AND SERVICE HANDBOOK page 39 48 Dimensions Condensation module Heat recovery module ...