![Cornelius 221001320 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/cornelius/221001320/221001320_operators-manual_2667579031.webp)
Operation
Cornelius Deutschland GmbH
Document no. TD1002000
Version 01/10/2019, Index 2
Operator manual Undercounter cooler
Energize 2-5 HC
29
7. Check the pressure-reducing valve on the water pip to make sure the water pressure is
set as specified (for the setpoint, see chapter 3.3).
8. Check the fill level and the connection of the syrup containers and BIBs and replace the
empty containers with full ones; see chapter 4.2.
9. Check that the tower is fully operational; see the document “Tower operator manual”.
Once the unit has been switched off and only then:
1. Check the water level gauge to make sure the water pan
is filled up with tap water.
Make sure the water level is between minimum and max-
imum.
If necessary, fill up the water bath with tap water.
2. Check that the CO
2
bottle valve is open; see documenta-
tion on the CO
2
system.
If necessary, open the valve on the CO
2
bottle.
3. Check the pressure-reducing valve on the CO
2
bottle to
make sure CO
2
pressure for carbonation is set as speci-
fied (for the setpoint, see chapter 3.3).
4.
Only for types with CO
2
-operated syrup pumps:
Check
the second pressure-reducing valve on the CO
2
bottle to
make sure the CO
2
pressure for pressurising the syrup
pumps is set as specified (for the setpoint, see chapter
3.3).
5. Check that the CO
2
shut off valves are open; see docu-
mentation on the CO
2
system.
If necessary, open the CO
2
shut off valves.
6. Check that the water supply valve is open; see documen-
tation on the water supply valve.
If necessary, open the water supply valve.
Fig. 14
1. Plug the mains plug into the earthed socket, if applicable.
Fig. 15