11
Installing your system
To install your system, please follow these instructions.
1.
studs.
Locate a load-bearing wall stud using a stud finder.
Mark the centerline (middle) of the stud.
NOTE: In any wood frame structure, load-bearing wood studs are
always 16-inches apart. This is to accommodate the installation of the
drywall. A magnetic stud finder (the small stud finder in the photo at
left) use magnets to locate the nails used to install the drywall. For this
reason, they are very accurate. An electronic stud finder use changes in
capacitance to locate the stud.
2.
mark hole.
Hold the unit in the desired position against the wall
with the mounting hole directly on top of the centerline of the stud.
Mark the top mounting hole.
3.
Drill bit.
Using a standard
1
/
4
-inch drill bit, measure the drill bit against
the length of the lag screw. The drill bit in the photo happens to be
the same length of the lag screw (about 2
1
/
2
-inches).
Drill a hole equal to length of the lag screw. If the drill bit is longer
than the lag screw, place a piece of tape around the drill bit marking
2
1
/
2
-inches of the bit.
4.
starter hole.
Drill a starter hole the entire length of the drill bit
(or to the tape marking 2
1
/
2
-inches).
Содержание Anchor Gym CORE
Страница 1: ...CoreEnergyFitness com THE ANCHOR GYM OWNER S MANUAL...
Страница 20: ...19 Sample Threading Anchoring Techniques...