Cooper Crouse-Hinds FBT-3 Скачать руководство пользователя страница 5

EUROPE (EMEA) 

Tel: +44 (0)1582 723633  

Fax: +44 (0)1582 422283

AMERICAS 

Tel: +1 281 571 8065  

Fax: +1 281 571 8069

ASIA PACIFIC 

Tel: +65 6 487 7887   

Fax: +65 6 487 7997

E-mail: [email protected]    Web site: www.mtl-inst.com

accurate characterisation 

of fieldbus wiring

FBT-5

The Fieldbus Wiring Validator, FBT-5

is used 

in combination with the Relcom Fieldbus Monitor, FBT-6, 
to test new or existing field wiring to determine its 
suitability for use in a F

OUNDATION

 fieldbus™ network. 

The FBT-5 acts as a signal generator, supplying DC 
power and a simulated fieldbus signal to the wire 
pair being tested. The FBT-6 is then used to take 
power, signal, and noise measurements. Testing can 
be performed on existing instrumentation wiring, 
multi-pair cables, newly installed fieldbus cable, or 
a complete fieldbus wiring system with wiring blocks 
and terminators already installed.

Connection

Using the clip leads, connect the FBT-5 to one 
end of the cable. To the other end, attach the Test 
Terminator. Connect the FBT-6 to the Test Terminator. 
Be sure to attach the red clips to the positive fieldbus 
wires and the black clips to the negative. If the wires 
are reversed, the Monitor will not function.

Caution
The FBT-5 must not be used in a hazardous 
area without a gas clearance certificate. 
If connected to an IS trunk, even in a safe 
area, the gas clearance must cover the 
whole system.

Operation

The Wiring Validator has a push-button Power switch 
to turn it on or off. If the Wiring Validator is turned 
on with a single click of the Power button, it will stay 
on for about 5 minutes and then automatically turn 
itself off to conserve battery power. If the Wiring                   
Validator needs to be powered on indefinitely, such 
as when wire testing is being performed by a single 
person, press and hold the Power button for about 
3 seconds. The green Power On light shows that the 
Wiring Validator is on.

If the Power On light blinks rapidly (about three 
times per second), the Wiring Validator or 
Fieldbus Monitor is not attached to the wire pair 
or the connection is reversed.

If  the  Power  On  blinks  slowly  (about  once  a 
second), there is a good connection to the 
wire pair and Fieldbus Monitor, and the Wiring 
Validator  is  in  battery  save  mode  (and  will 
automatically power down in about five minutes).

If the Power On indicator lights continuously, all 
connections have been made properly and the 
Wiring Validator will stay on until it is manually 
powered off. When the Wiring Validator is 
turned on, the Fieldbus Monitor powers up and 
displays the following readings:

Voltage should be between 9 and 10V

(

continued overleaf

)

Use with FBT-6 to measure 
signal and noise levels

Test fieldbus wiring before the 
control system is installed

Signal generator for testing 
fieldbus wiring

Operates with wiring blocks 
installed

FBT-5

FBT-6

Cable to be tested

T

Aug 2008

Relcom

Содержание FBT-3

Страница 1: ...Fieldbus Networks Test Equipment FBT 3 FBT 4 FBT 5 FBT 6 FBT 6 PA...

Страница 2: ...network segment by providing measurements of bus power level minimum signal level and peak and average noise level It also displays the number of devices present on the segment and indicates when dev...

Страница 3: ...of the Probe Node frame The signal level is in millivolts Device If there are fieldbus devices active on the network the Monitor counts them If the count has remained the same since the Device functi...

Страница 4: ...dition Following are descriptions of the three indicators Signal indicates that there is bus activity It will only light if data traffic is detected with peak to peak amplitude greater than 150 mV The...

Страница 5: ...the gas clearance must cover the whole system Operation The Wiring Validator has a push button Power switch to turn it on or off If the Wiring Validator is turned on with a single click of the Power...

Страница 6: ...the Wiring Validator is first attached to a wire pair A continuously lit Low Battery light indicates that the batteries need to be replaced Self Test To verify that the Wiring Validator and the Fieldb...

Страница 7: ...number of devices present on the segment and indicates when devices are added or removed from the network It also detects the presence of a short between either of the signal wires and the cable shie...

Страница 8: ...mal and hexadecimal is also displayed This will be the lowest signal level reading from a device since the Monitor was connected to the fieldbus Measurements greater than 150mV are OK Device The addre...

Страница 9: ...easurement range 8 to 32 0 5 V DC Noise measurement ranges LF 50Hz to 4kHz 0 to 1000 mVpp 15 25mVpp FF 9kHz to 40kHz 0 to 1000 mVpp 10 25mVpp HF 90kHz to 350kHz 0 to 250 mVpp 20 25mVpp Signal level me...

Страница 10: ...Class I Zone 2 IIC T4 Ui V Imax Gps A B IIC mA Imax Gps C D IIC IIA mA NIFW 32 1500 1500 FNICO 17 5 274 570 Canada FM C22 2 No 213 C22 2 No 157 CAN CSA E79 0 95 CAN CSA E79 11 95 3028840 Class I Div 1...

Страница 11: ...ther of the signal wires and the cable shield Modern fieldbus commissioning procedures require various bus parameters to be measured and recorded Key parameters include bus voltage signal level for ea...

Страница 12: ...ifficulties may show up on the FBT 6 PA as repeatedly being added or dropped If a device leaves the segment the display shows if a new device is added it shows Device The address in decimal and hexade...

Страница 13: ...0mA max USB mode 30mA max Power dissipation Fieldbus mode 320mW max 32 VDC USB mode 165mW max 5 5 VDC Operating Temperature 20 to 50 C Dimensions 146 x 88 x 28 mm 5 7 x 3 5 x 1 1 inches Weight 378g 0...

Страница 14: ...D IIC IIA mA NIFW 32 1500 1500 FNICO 17 5 274 570 Canada FM C22 2 No 213 C22 2 No 157 CAN CSA E79 0 95 CAN CSA E79 11 95 3028840 Class I Div 1 ABCD T4 Class I Zone 0 and 1 AEx Ex ia IIC T4 Ui V Imax G...

Отзывы: