Hydro Box of C
H
V5 Home Installation and Operation Manual
19
corresponding floor heating shunt valve no.:
1) Check the IDU project no. in its wired controller. For example: The IDU project no. in
this room is
“9”.
2) Check the floor heating shunt valve no. connected with the floor heating in the electric
box of hydro box. For example: The floor heating shunt valve no. is
“floor heating
shunt valve 3
”.
3) Make sure the IDU is in accordance with the floor heating shunt valve. As the
examples above, floor heating shunt valve 3 is in accordance with IDU project no. 9.
Step 2: Setting of corresponding relationship (linkage) is shown as below:
Содержание HB16NK
Страница 11: ...Hydro Box of CHV5 Home Installation and Operation Manual 8 Installation steps ...
Страница 20: ...Hydro Box of CHV5 Home Installation and Operation Manual 17 ...
Страница 23: ...Hydro Box of CHV5 Home Installation and Operation Manual 20 ...
Страница 24: ...Hydro Box of CHV5 Home Installation and Operation Manual 21 ...
Страница 33: ......