3.
1
Transportation
Transport the product as close to the installation
locatio
n as possible be
fore unpacking.
Do not put any material on the product.
Apply two lifting wires onto the outdoor unit,
when lifting it by crane.
!
Hanging Method
:
When hanging the unit, ensure a balance of
the unit, check safety and lift up smoothly.
(1) Do not remove any packing materials.
(2) Hang the unit under packing condition with
two (2) ropes, as shown in Fig. 3.1.
Fig.3.2 Transportation for no wooden base
Fig. 3.1 Hanging Work for Transportation
If have no package to move,
p
lease protect with
cloth
or
paper
Put Cloth or Paper
Do not put any foreign material into the
outdoor unit and check to ensure that none
exists in the outdoor unit before the
installation and test run. Otherwise, a fire or
failure, etc. may occur.
3. Transportation and Handling
3.2
Handling of Outdoor Unit
!
When Using Handles
:
When manually lifting the unit using the
handles, pay attention to the following points.
(1) Do not remove the wooden base fro
m the
outdoor unit.
(2) To prevent the unit from overturning, pay
attention to the center of gravity as shown
in the below figure.
(3) Two or more personnel should be used to
move the unit.
Fig. 3.
3
Handling of Outdoor Unit
Do not remove the plastic
band or the corrugated
paper frame.
Pass the wire ropes
through
each lifting
hole in the wooden
base as shown.
2~3 ft.
Содержание CHV6-36URBM
Страница 16: ...5 3 Branch Pipe for Line Branch Unit in Inner Diameter Table 5 7 Shape Branch Pipe B 10 H 11 Branch Pipe...
Страница 31: ...26 Table 8 1 Checking of Wire Connection by Test Run...
Страница 32: ...SPWT J01 27 7...
Страница 34: ...able 8 3 Alarm Code T 29...