1-4 Available Options 

 

PCA Series Chillers are available with options that tailor the unit to your requirements. 
Some are factory installed, some can be retrofitted in the field.  
 
Some of these options are: 

Special Pumps 

Special pump options are available for greater pressure and flow rates. Bronze and stainless 
steel wetted surface standard flow pumps ranging from 2.07 Bar to 4.14 Bar are available. 
 

Reservoirs 

PCA Series Chillers are available without a reservoir for processes that use their own 
reservoir. 

Power Cord 

A 3 meter power cord is available to speed PCA installation. 
 

Casters 

Four 50mm swivel casters add mobility to the PCA unit. 
 

CPR Valve 

A crankcase pressure regulating (CPR) valve is available for leaving water temperatures up to 
24°C. 

 

1-5 Un-crating Your New Chiller 

 

PCA Series Chillers are shipped mounted on a skid, enclosed in a plastic wrapper, and open 
crated on all four sides and top. 
 

  

Pry the crating away from the skid and remove. Use a pry bar to remove the blocks 
securing the unit to the skid. 

  

Lift the unit off the skid with a fork truck. Insert forks between skid and chiller from the 
side until they protrude beyond the opposite side of the unit. The forks must be 
equidistant from the centre line of the unit and the unit must be balanced on the forks. 

  

Lift slowly and only high enough to clear the skid. Use a pry bar if necessary to 
remove the skid from the unit. 

  

Lower slowly. The unit will land on its feet or casters and can be moved into position. 

 

 

Содержание PCA050

Страница 1: ...Chiller Operation Manual Write Down Your Serial Numbers Here For Future Reference _________________________ _________________________ _________________________ _________________________ ______________...

Страница 2: ...Page 2 We are committed to a continuing program of product improvement Specifications appearance and dimensions described in this manual are subject to change without notice...

Страница 3: ...ition to information for operating the equipment safely and efficiently The Maintenance chapter is intended to serve as a source of detailed assembly and disassembly instructions for those areas of th...

Страница 4: ...ng Damages 1 7 If the Shipment is Not Complete 1 8 If the Shipment is Incorrect 1 9 Returns 2 Chiller Installation 13 2 1 Electrical Connections 2 2 Process Water Connections 2 3 PCA Condenser Air Sup...

Страница 5: ...op Table 5 Microprocessor Control 25 5 1 Introduction 5 2 Setting the Process Water Temperature 5 3 LED Indicators 5 4 Temperature Controller Keys 5 5 Auto Tuning PCA Series Chillers 5 6 Optional Comm...

Страница 6: ...rve 16 Figure 7 Overhead Piping 17 Figure 8 PCA Component Identification 20 Figure 9 Piping Schematic 1 Pump with Reservoir 21 Figure 10 Piping Schematic 1 Pump Without Reservoir 22 Figure 11 Piping S...

Страница 7: ...ocuments are necessary for the operation installation and maintenance of PCA Series Chillers Additional copies are available from Fleming Dynamics Pty Ltd Familiarize the appropriate personnel with th...

Страница 8: ...CA unit CPR Valve A crankcase pressure regulating CPR valve is available for leaving water temperatures up to 24 C 1 5 Un crating Your New Chiller PCA Series Chillers are shipped mounted on a skid enc...

Страница 9: ...of Lading is attached to our original invoice If the shipment was prepaid write us for a receipted transportation bill Advise Fleming Dynamics regarding your wish for replacement 1 7 If the Shipment i...

Страница 10: ...Page 10 1 9 Returns IMPORTANT Do not return any damaged or incorrect items until you receive shipping instructions from Fleming Dynamics...

Страница 11: ...Page 11...

Страница 12: ...Page 12...

Страница 13: ...Page 13 BSP BSP BSP inches BSP inches BSP...

Страница 14: ...meplate rating 2 2 Process Water Connections All external chilled water connections to the process must be of adequate size See Figure 7 on page See 17 for sizing recommendations The largest possible...

Страница 15: ...scharged from the chiller Do not put the PCA unit where steam hot air or fume exhausts will be drawn into the condenser Air cooled condensers must be cleaned frequently Neglect reduces capacity increa...

Страница 16: ...ir is not designed to withstand water pressure above 34 kPa The fill opening and vent line must be vented to the atmosphere for proper operation Ethylene Glycol Required For Evaporator Freeze Protecti...

Страница 17: ...n can occur on system shutdown when the water in the system drains into the reservoir To prevent this install a check valve in the unit TO PROCESS line and a vacuum breaker at the high point of the re...

Страница 18: ...cuit Liquid refrigerant from the condenser passes through a filter dryer which removes moisture and other contaminants The refrigerant then passes through the thermal expansion valve which allows the...

Страница 19: ...ro mechanical safety feature that prevents compressor suction pressure from dropping below a pre set point It is factory set to open the control circuit when pressure drops below a safe level The chil...

Страница 20: ...Page 20...

Страница 21: ...Page 21...

Страница 22: ...Page 22...

Страница 23: ...Page 23...

Страница 24: ...TO PROCESS and FROM PROCESS connections should be completed 4 Be sure the reservoir tank and chilled water circuit piping are filled with water 5 The air cooled condenser should have an adequate suppl...

Страница 25: ...Page 25...

Страница 26: ...ton to raise the set point Press the Down Arrow button to lower the set point 5 3 LED Indicators PV or Process Value Numeric LED During normal operation the large red PV LED on the controller displays...

Страница 27: ...temperature at the To Process thermocouple is two degrees 2 F C below the set point This 2 F C control set point is factory set for proper compressor operation Changing it is not recommended without c...

Страница 28: ...he set point This 2 F C control set point is factory set for proper compressor operation Changing it is not recommended without consulting the Fleming Service Department 5 4 Temperature Controller Key...

Страница 29: ...as many as three 3 times It will then level off and control to the process set point Auto tuning can take up to 45 minutes and is best done before any product is being run Important Factory default s...

Страница 30: ...parameters by a program prepared and running on a host computer connected to the E5CK controller When using the communications function you must add on the unit for RS 232C or RS 485 communications T...

Страница 31: ...ion service technician for service LOW REFRIGERANT PRESSURE red This indicator lights if the refrigerant pressure drops below a safe level The compressor will stop and remain off until the pressure re...

Страница 32: ...Page 32...

Страница 33: ...result in dislodging the bearing grease retainer eventually causing bearing failure Compressors are hermetically sealed no oiling is required 7 2 Condenser Maintenance Dirty condenser heat exchange su...

Страница 34: ...Page 34...

Страница 35: ...Page 35...

Страница 36: ...Page 36 Notes...

Страница 37: ...Page 37...

Страница 38: ...Page 38...

Страница 39: ...Page 39...

Страница 40: ...Page 40 Notes...

Страница 41: ...Page 41 Notes...

Страница 42: ...Page 42 Notes...

Страница 43: ...provide your company with genuine OEM quality parts manufactured to engineering design specifications which will maximize your equipment s performance and efficiency To assist in expediting your email...

Отзывы: