14
W415-0380 / E / 08.31.12
4.3 ALCOVE
INSTALLATION
55.1A
A.
Attach the nailing tabs to the corner posts using the 2 sheet metal screws sup-
plied. Secure through the centre of the top and bottom slots in the nailing tab and
then through the existing holes in the corner posts. If there are no existing holes,
follow these instructions:
B.
To determine the fi nal location of the nailing tab you must fi rst determine the
thickness of your fi nishing material (i.e. drywall). This will determine the dimen-
sion from the front edge of the corner post to the nailing tab. Once the nailing tab
is in the desired location, drill through the centre hole of the nailing tab. Secure
with a sheet metal screw*.
* Additional set screws may be installed.
NAILING TAB
4.4 NAILING TAB INSTALLATION
APPLIANCE
RECESS OR
ALCOVE
AREA
NOTE:
Recesses or alcoves above the appliance can be made as deep as desired provided the minimum
clearances to combustibles are maintained.
Non-combustible material can be used, provided the minimum clearances to combustible materials are applied.
The minimum enclosure volume must be increased by no less than the volume of the recess. This adjustment
can be made by increasing any or all of the height, width and depth of the enclosure.
71.2
ENCLOSURE
AREA
Содержание CVF42N
Страница 30: ...30 W415 0380 E 08 31 12 43 1 13 0 SERVICE HISTORY ...
Страница 31: ...31 W415 0380 E 08 31 12 14 0 NOTES 44 1 ...
Страница 32: ...32 W415 0380 E 08 31 12 ...