Fig. 2  Do not expose collector covered with protective film to rain.

Preventing frost Damage

After pressure testing and flushing, collectors cannot be 
completely emptied. Make sure that no pure water re-
mains in collector during risk of frost!

1.7 Recycling Note

At the end of the long operational lifetime, the valuable 
materials of the installation should be recycled in an envi-
ronmentally sound manner.

Fig. 3  WARNING! Collector connections heat up during solar irradia-
tion. 

Fig. 4  Remove glass protection film before installing collector!

Содержание EURO L20

Страница 1: ...d tiles Installation with classic slates generally is carried out in the same way Fig 1 Partial view of EURO roof integration with plain tile roofing Content 1 General Safety Notes 2 1 1 Symbols 2 1 2...

Страница 2: ...p Maintenance For maintenance notes and additional information about setup and operation of the collector field please refer to the technical information Solar Thermal Systems 1 5 Notes on Proper Coll...

Страница 3: ...d Make sure that no pure water re mains in collector during risk of frost 1 7 Recycling Note At the end of the long operational lifetime the valuable materials of the installation should be recycled i...

Страница 4: ...anels slate plain tile 28 819 720 99 10 Silicone T profile 1 819 450 10 11 Corner wedge bottom left 2 parts 1 819 720 95 819 721 06 12 Corner wedge bottom right 2 parts 1 819 720 98 819 721 07 13 Flas...

Страница 5: ...1 819 450 20 5 Cellular rubber tape 2 110 101 23 6 Collector fixing clip top 2 190 102 15 7 Silicone T profile 1 819 450 10 8 Flashing sheet bottom 1 819 720 96 9 Collector fixing clip bottom 1 819 72...

Страница 6: ...s At least three rows of roof tiles should be kept above and below the collector field The roof tile rows above the collector have to project for at least 150 mm over the upper flashing sheet Procedur...

Страница 7: ...Counter battens 3 Sub membrane lower delta sarking 4 Rafters 5 Vapor proof sarking 6 Backside ventilation space Fig 9 Serial connection of horizontally installation max 6 collectors Connection of more...

Страница 8: ...ors with approx 8 mm spacing 2 Fig 12 Insert silicone T profile between collectors Alternately push ing and pulling eases work Then push collectors together until flush Fig 13 Screw on upper collector...

Страница 9: ...ollector connection hose stainless steel 18 mm to the solar circuit for example via double socket or compression ring coupling Fig 18 Slip rubber seal over cable insert solar sensor into sensor sleeve...

Страница 10: ...led through the tiles to afix them on the battens Fig 26 Position the following tiles as in Fig 22 and Fig 23 align at upper edge of following batten afix with nail Fig 27 Cover each panel properly wi...

Страница 11: ...Fig 31 Interlock upper flashing sheets into one another at the crimped edges use rear ear for fixing sheets against sliding details above Fig 32 Lay upper flashing sheet in place and push sheet groov...