Conergy AS
Owners Manual
1
Collector Installation
5.1
After selecting the solar collector
location, the final check before
installation is that the available roof
space is sufficient for the solar
collectors being installed.
The length up the roof must be at least
3 metres for all installations.
Please note: Roof areas smaller than the minimum measurements will make installation and
later service work more difficult.
Installing the collectors
The procedure for solar collector installation is as follows:
Figure 3:
Collector Installation Area
Figure 4
: Collector Installation General Assembly
1 panel = 2000 mm
2 panels = 3000 mm
3 panels = 4000 mm
500
500
500
500
3000 mm
System
Roof space width required
1 panel
2000 mm
2 panel
3000 mm
3 panel
4000 mm
1. Mark a point for the bottom left corner of the collector installation. This point should be at least
500 mm up from the roof edge and 500 mm to the side of any obstruction or roof edge.
2. Place one end of the collector mounting rail
(Detail D, 60-3028)
adjacent to the location marked
in step 1, and laid horizontally across the roof to the right.
3. Locate two roof trusses which are under the collector mounting rail (as near as possible to the
outer edges of the rail). Clip two collector straps
(Detail E, 60-4011)
to the collector mounting
rail where the trusses pass under the mounting rail.
Collector Installation