10. Commissioning
After the installation of the pumps in the pump sump connect the Schuko plugs of the
pumps with the sockets provided for this purpose.
ATTENTION!
Before opening the cover of the electrical connection compartment, disconnect the
mains plug from the power supply.
DIP switch
Float switch
Connect the float switches to the terminal block as follows:
Level 1 = KS “C“ (Down / OFF).
Level 2 = KS “B“ (Middle / ON).
High water = KS “A“ (Top / ALARM)
Basic settings for the DIP switch:
DIP switch 1, 2, 3 in “OFF“ position
DIP switch
“OFF“
“ON“
1
Two pumps connected
One pump connected
2
Two pumps connected / parallel
operation of both pumps
possible
Two pumps connected / single
operation - no parallel operation
possible
3
Relay = alarm acknowledgeable
Relay = alarm cannot be
acknowledged
4 - 8
Not used
Not used
23
Commissioning