3 - 6
l I n s t a l l a t i o n
When configured as a
central dryer, the dry-
ing temperature can
not be set since there
is no process heater in
the system.
C h e c k i n g f o r P r o p e r A i r F l o w
IMPORTANT:
This procedure must be performed before loading material into the hopper.
CAUTION:
If the airflow direction is incorrect due to improper phase connection, material from
the hopper can be pulled back into the dryer, causing permanent damage to this equipment.
1
Turn on the main power to the dryer.
Make sure the dryer’s disconnect dial is in the ON
position. This powers up the control and the display will illuminate.
2
From the Home Screen , press the “Setup” button.
OFF
O
O
N
I
WARNING:
All wiring, disconnects, and fuses should be installed by qualified elec-
trical technicians in accordance with electrical codes in your region. Always main-
tain a safe ground. Do not operate the equipment at power levels other than what
is specified on the machine serial tag and data plate.
NOTE:
Users must be
logged in as Maint 1
(user level 3) in order to
perform this operational
test.
✐
Содержание Carousel Plus W Series
Страница 6: ...iv l Table of Contents...
Страница 20: ...2 8 l Description...
Страница 34: ...3 14 l Installation...
Страница 44: ...4 10 l Operation Control Function Flow Charts From the Alarm screen Home Alarms...
Страница 82: ...4 48 l Operation Control Function Flow Charts From the Alarm screen Home Alarms Alarm Banner Pop up...
Страница 114: ...4 80 l Operation...
Страница 115: ...4 O p e r a t i o n General Operation Stand Alone and ResinWorks Dryer Configuration Operation l 4 81...
Страница 130: ...4 96 l Operation...
Страница 184: ...B 3 l Appendix...