P
REPARING FOR
I
NSTALLATION
Series 1 Portable Chillers, PLC Control
UGH017/0500
3-4
I
NSTALLATION
Plan the location for the chiller and prepare the area properly.
Position the Chiller as close to the process machine as possi-
ble. Place the chiller in position near the process machine so
that fluid lines can be connected from the process machine to
the chiller and back.
Chiller
Process machine
Alternate
locations
24 inches
(610 mm)
24 inches
(610 mm)
●
Available water source.
If installing a water-cooled unit, make sure condenser
water source is plumbed to chiller installation location.
High points in plumbing require vent valves; low points
require drain valves.
Make sure the area where the chiller is installed has:
●
A grounded power source.
Check the chiller’s serial tag for the correct amps, volt-
age, phase, and cycle. All wiring should be completed by
qualified personnel and comply with your region’s electri-
cal codes.
●
Clearance for safe operation and maintenance.
Make sure there is two feet clearance around the chiller
for proper operation, maintenance, and servicing. After
positioning, lock casters to prevent chiller from moving.
24 inches
(610 mm)
24 inches
(610 mm)