![Comtech Xicom Technology XTD-750K Скачать руководство пользователя страница 135](http://html1.mh-extra.com/html/comtech-xicom-technology/xtd-750k/xtd-750k_operation-and-installation-manual_2648551135.webp)
TH I S DO C UM EN T I S TH E PR O P ER TY O F X IC O M TE C HN OL O G Y. RE PR O D UC TI O N OR R E L EA SE W I TH O UT E X PR ESS PER M IS S IO N I S S TR IC TL Y PR OH IB I TE D .
XTD-750K, 12.75 - 14.5, L01
Document No. 305-0391-032
REV 4
Page 7 of 10
5.0
TESTING REQUIREMENTS
5.1
Acceptance Test Procedure (ATP) requirements.
Frequency
3.1.1
Power
3.1.2
Transfer curve at mid-band
3.1.2
Gain, large signal
3.1.3
Gain, small signal
3.1.4
Gain flatness, small signal
3.1.5.1, 3.1.5.2, 3.1.5.3
Gain Control
3.1.6
Intermodulation
3.1.7
Spurious signals
3.1.14
Prime Power
3.1.16
5.2
First Article Test Procedure (FAT) requirements.
FAT testing is done per the specified agreements between Xicom and its customers.
The FAT test shall include at a minimum the ATP. Please specify the FAT
requirements at the time of order of the product.
EAR EXPORT CONTROLLED: The information contained in this Manual refers or relates to a product that is subject
to the U.S. Export Administration Regulations (EAR). Transfer of data herein by any means to a Foreign Person,
whether in the U.S. or abroad, may require an export license from the U.S. Department of Commerce.