![Comtech Xicom Technology XTD-1250KL Скачать руководство пользователя страница 138](http://html1.mh-extra.com/html/comtech-xicom-technology/xtd-1250kl/xtd-1250kl_operation-and-installation-manual_2648550138.webp)
THIS DOCUMENT IS THE PROPERTY OF XICOM TECHNOLOGY. REPRODUCTION OR RELEASE WITHOUT EXPRESS PERMISSION IS STRICTLY PROHIBITED.
XTD-1250KL,12.75-14.5 GHZ,L01,EN1
Document No. 305-0521-997
REV 4
Page 7 of 13
5.0
TESTING REQUIREMENTS
5.1
Acceptance Test Procedure (ATP) requirements.
Frequency
3.1.1.1
Power
3.1.2
Transfer curve at mid-band
3.1.2.1
Reflected Power Protection
3.1.2.3
Gain, large signal
3.1.3
Gain, small signal
3.1.4.1
Gain control
3.1.4.2
Gain flatness, small signal
3.1.5.1, 3.1.5.2, 3.1.5.3
Gain Stability
3.1.5.4, 3.1.5.5
Noise Power, Transmit Band
3.1.9.1
Spurious signals
3.1.12.1, 3.1.12.2, 3.1.12.3, 3.1.12.4
Intermodulation products
3.1.6
Prime Power
3.1.14
Sample Port Calibration
N/A
5.2
First Article Test Procedure (FAT) requirements.
FAT testing is done per the specified customer requirements.
The FAT test shall include at a minimum the following ATP.
EAR EXPORT CONTROLLED: The information contained in this Manual refers or relates to a product that is subject
to the U.S. Export Administration Regulations (EAR). Transfer of data herein by any means to a Foreign Person,
whether in the U.S. or abroad, may require an export license from the U.S. Department of Commerce.