background image

NAME: __________________________________

INV #: __________________________________

DATE: ___________________________________

BOX PULLED BY: __________________________

STAGED BY: ______________________________

SHIPPING WEIGHT: 1,175 lbs

PIECES: 32 

MODEL PH52

_____ 2-13’11” top rail, one drill

_____ 1-13’11” top rail with insert

_____ 2-triple ends with socket 

_____ 1-4’ x 4’ Deck package 

_____ 4-10’6” PH Legs 

FOR PLASTIC ROOF

 

_____ 1-Entrance Barrier

_____ 2-Exit Barrier

_____ 1-Side Barrier

_____ 2-8’ 4 rung ladder, adj. sleeves 

_____ 1-8’ 4 rung ladder 

_____ 1-12’6” horizontal ladder 

_____ 4-8’ A-frame legs 

_____ 1-MT fire pole

_____ 1-Turning Bar w/2 3/8” clamp

_____ 1-CH/PH Loop Climber

_____ 1-Buoy Ball _______________ 

_____ 1-10’ Plastic Rave Slide ___________ 

_____ 1-Molded plastic tire _______________ 

_____ 1-PH Platic Roof__________________

 

■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■

   

_____ 3-5” strap seats __________________

_____ 1-Pair of rings ___________________

_____ 1-trapeze bar ____________________ 

_____ 12-2 ⅜” Brass Bushing Hangers

_____ 2-5½’ chains conected with s-hook ______________

_____ 9-5½’ chains ________________

_____ 4-3½’ chains ________________

_____ 1-trapeze bar ________________

■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■

_____ 1 - Steering wheel _________________

_____ 1 - Steering wheel hardware pkg 

_____ 1 - Telescope _______________

_____ 1 - Telescope hardware pkg

■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■

_____ 1- 2⅜” tire swing clamp

_____ 1-2⅜” clamp

_____ 1- 2 3/8” clamp rounded

_____ 2- MT Bolt Packs

_____ 2 -Spring Clip 12 Packs

_____ 1- Playhouse bolt Pack

_____ 1- HL Bolt Pack

_____ 1- Tire Swing Bolt Pack

_____ 4-Panel clamps (2 pair)

_____ 2-⅜” x 2” Carriage bolts

_____ 2-⅜” Hex nuts

_____ 8-⅜” x 1½” hex bolts

_____ 4-⅜” nyloc nuts

_____ 4-⅜” x ⅜” set screws

_____ 4-brackets for roof

_____ 8-Zip toggles

_____ 8-1/4” x 2” tap bolts

_____ 8-⅜” flat washer

_____ 4-⅜” x 1 1/2” self tap bolts

_____ 1 - Can of ____________ touch up paint

■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■

_____ Instructions 

_____ Include CH/PH Fire Pole install sheet

■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 

Modifications for Shipping

_____ Shipping letter sent

_____ Parts Labeled

_____ Packing list attached to box

_____ Remove turning bar

_____ 1 - 6’ toprail

_____ 1 - Turning bar cross piece

_____ 1 - 2 ⅜” plastic plugs

_____ 3 - 3/8” x 3/8” Set Screws

Last Modified: 6/1/2009

Содержание PH52

Страница 1: ...__ _____ 12 2 Brass Bushing Hangers _____ 2 5 chains conected with s hook ______________ _____ 9 5 chains ________________ _____ 4 3 chains ________________ _____ 1 trapeze bar ________________ _____...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ...RUCTIONS MODEL PH52 GROUND SPACE 37 X 32 RESIDENTIAL PLAY SPACE 41 X 41 15 1 20 20 20 20 20 24 21 24 20 20 20 24 21 24 20 27 10 80 66 12 9 10 4 9 5 5 CLEARANCE AT END OF SLIDE 13 11 10 swing clearance...

Страница 6: ...PH52 Install Instructions...

Страница 7: ...play space as shown below Mark where the ladder holes will need to be dug Remove the top rails and horizontal ladder and dig the ladder holes to the measurements specified below 41 41 12 12 6 Hole si...

Страница 8: ...e 2 holes drilled and tapped at the top of the 13 11 toprail 13 11 Toprail 13 11 Toprail w insert Insert 3 8 set screws and secure them tight Holes for set screws drilled and tapped Assembling and sta...

Страница 9: ...by completing 4 a before continueing The rest of step 4 will be shown later 4 a Make a mark 108 up from the bottom of the ladder onto each ladder rail Move the adjustable sleeves to these marks and po...

Страница 10: ...into the holes You can allow the structure to stand it will not be level at this time Situate the ladder and A frame legs as desired in the space Be certain that the top rail has not slid away from i...

Страница 11: ...e the legs out of the way and dig the holes Notice Most of the A frame leg hole needs to be dug towards the inside of the A frame leg 3 d Level out structure As shown below A Frame leg holes are to be...

Страница 12: ...eeves of the 8 ladder Once sleeved onto 8 ladder have person in place 1 take the 8 ladder that is leaning in the hole and bring it forward to sleeve it into horizontal ladder While the person in place...

Страница 13: ...structure Secure all set screws on top of upright ladders bottom of the horizontal ladder 2 1 The person in place 1 push the ladder up and sleeve the adjustable sleeves into the horizontal ladder LEVE...

Страница 14: ...e holes as before When the holes are ready insert the legs into the holes and level the top rail Slide 13 11 Toprail Through 8 Top Sleeve 3 h First repeat step 3 a After toprail is assembled to triple...

Страница 15: ...ng assembly some of the set may have got off level Take a minute to make sure the structure is still level Place level in the places indicated below LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL LEV...

Страница 16: ...ut apart and attach to the support plates using the 2 grabber screw Refer to Top View e The platform should just square its self up as it is assembled However you should verify that the platform is sq...

Страница 17: ...to determine how to assemble the playhouse using the configura tion that you have purchased a Locate the four playhouse legs Measure 45 from the end of the pipe to the center of the first hole to det...

Страница 18: ...out illustration with TWO EXITS Layout illustration with ONE EXIT 4 Under 4 Under 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg...

Страница 19: ...er 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg Playhouse Leg Playhouse Leg Playhouse Leg Optional Horizontal Ladder Optional H...

Страница 20: ...es previously drilled into the platform support plates The platform sup port plates should be vertical Attach the platform to the legs In each leg use the following 2 5 16 x 3 hex bolts 2 5 16 flat wa...

Страница 21: ...cture The two legs that are on the ground should be laying just over the ladder hole and the adjacent leg hole as shown in figure 4d k Stand the playhouse into the holes previously dug Figure 4e and 4...

Страница 22: ...lb bag of concrete mix Determine Desired Location of Fire Pole on the Top Rail or the Turning Bar on the Upright Ladder Leg Determine location of hole and dig hole as shown below Clamp Fire Pole or Tu...

Страница 23: ......

Страница 24: ...ion will allow your slide to receive a lot of abuse If the slide is hit from the side by a lawn mower or similar device either the sheetrock screw will break or the screw head will pull through the sl...

Страница 25: ...rch Leg Playhouse Leg STEP 1 Slide Arches into Canopy Pockets Top of Arches should curve away from each other STEP 2 Slide all four Arch Legs into Playhouse Legs at the same time Tighten Set Screws Ca...

Страница 26: ...t Plug Plastic Pivot 7 16 Washer Bracket with welded bolt Push two 1 3 8 Plugs in the ends 3 8 Nyloc Nut Assemble Steering Wheel as shown above Then attach Bracket to the Barrier with panel clamps and...

Страница 27: ...cope under the lip of the plastic ring and attach the other half of the plastic ring Plastic Ring Halves Bracket with welded washer Push 1 3 8 Plugs into both ends Telescope Base Assemble Telescope as...

Страница 28: ...abuse of this playground equipment is dangerous and can cause serious injury This equipment should be inspected before each use and any worn defective or missing parts should be replaced Children sho...

Страница 29: ...gers may become discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat of silver aluminum spray paint will make them look new again These...

Страница 30: ...Vinyl Canopies 7 If you have purchased a structure which includes a vinyl canopy this product should be inspected occasionally for wear and will need to be replaced as necessary Depending upon your en...

Страница 31: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Страница 32: ...not cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or c...

Страница 33: ..._______ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City ________...

Отзывы: