3.c. Make a mark in the soil for the A Frame Leg holes. Move the legs out of the way and dig the holes.
Notice!
Most of the “A” frame leg hole needs to be dug
towards the inside of the “A” frame leg.
3.d. Level out structure. As shown below.
“A” Frame leg
holes are to be
dug at 18” in
diameter by 12”
deep.
LEVEL
LEVEL
LEVEL
LEVEL
Содержание PH52
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 6: ...PH52 Install Instructions...
Страница 23: ......