Operating the UltraSCSI Enclosure
2–6 UltraSCSI RAID Enclosure
Applying Power
Initial power application is a matter of turning on the ac input boxes
located in the lower left and right corners of the enclosure (see Figure
2–2, labels A and B). Pressing the I on the ac power switch applies ac
power only to the shelf power supplies on the associated power bus
(bus A or B).
Note
Apply power in the following sequence:
1.
All expansion enclosures
2.
Master enclosure
Figure 2–2
AC Power Distribution
AC Input Box
AC Input Box and SBB Shelf
Power Supply Locations