
XP900
Console Reference
1-4
1.2
Power-Up Display
Testing begins after pressing the On/Off button, and screen text
similar to that in Example 1–1 displays (if the console terminal is
a serial terminal connected to the COM1 port), along with status
messages in the control panel display. If the console terminal is
a graphics monitor, only the last few lines of the power-up
display print.
Example 1–1 Power-Up Display
256 Meg of system memory
➊
probing hose 0, PCI
probing PCI-to-ISA bridge, bus 1
➋
probing PCI-to-PCI bridge, bus 2
➋
bus 0, slot 9 -- ewa -- DE500-BA Network Controller
bus 0, slot 11 -- ewb -- DE500-BA Network Controller
bus 0, slot 13 -- dqa -- Acer Labs M1543C IDE
bus 0, slot 13 -- dqb -- Acer Labs M1543C IDE
bus 0, slot 14
➌
-- vga -- DEC PowerStorm
bus 2,
➍
slot 0 -- pka -- NCR 53C875
bus 2,
➍
slot 1 -- pkb -- NCR 53C875
bus 2,
➍
slot 2 -- ewc -- DE500-AA Network Controller
bus 0,
➎
slot 16 -- pkc -- QLogic ISP1020
bus 0,
➏
slot 17 -- dra -- Mylex DAC960
Testing the System
Testing the Disks (read only)
>>>
➐
Figure 1–3 Physical Numbering for PCI Slots
64 Bit
64 Bit
64 Bit
32 Bit
PCI Slot 4
PCI Slot 3
PCI Slot 2
PCI Slot 1
PK1045-99
Содержание AlphaStation XP900
Страница 4: ......