The Community Loft
8
10
Place the landing platform(s) in posi-
tion, and add stairs. All four corners of
the stair should fit into connector rings.
9
Slide another connector ring flat side
down onto each post.
8
Screw post extenders on top of the
short
posts
which will support your landing. Do
not over tighten the posts. Align the sides.
A slight loose ness will not affect the sta-
bility of the finished loft.
7
Warning:
When arches are used on the 2nd level
they MUST be supported underneath
by Arch Supports!