
The Community Loft
12
20
Add the stair railings. The railings slide
into the slots on the stairs with the
‘bottom’ label down.
Hint:
Hold couplings and press down.
19
Follow the same procedure as you did in step 11 for the lower stairs. However note that on
the upper stairs, the 2 couplings at the top are 29" long and the 2 couplings on the bottom
are 22" long.
notches
29" Coupling
Left Railing
Left
Bottom
Label
22" Coupling