ADCP-93-090 • Rev C • March 2021
Page 44
© 2021, CommScope, Inc.
Figure 45. OSP Cable Ground Procedure (Steps 5 and 6)
5 TECHNICAL ASSISTANCE
For technical assistance, contact the CommScope Support Center using the following
website address:
http://www.commscope.com/SupportCenter
26089-A
TOP CLIP CONNECTOR
GROUND CONNECTOR
BASE CLIP CONNECTOR
SECURING NUT (2)
36 WIRE
SPLIT BOLT
CONNECTOR
ROUTE 36 WIRE AS SHOWN
6
ASSEMBLE COMPONENTS ON
STUD AS SHOWN
5
STUD
WIRE CLIP
(SECURE TO FRAME)
STRIP JACKET BACK 1.0 INCH
TO EXPOSE BARE WIRE
TIGHTEN NUT
TO GROUND LUG
Содержание OMX 600 Splice Bay
Страница 6: ...ADCP 93 090 Rev C March 2021 Preface Page 2 2021 CommScope Inc TABLE OF CONTENTS Content Page ...
Страница 41: ...ADCP 93 090 Rev C March 2021 Page 35 2021 CommScope Inc Figure 36 OSP Breakout Assembles ...
Страница 43: ...ADCP 93 090 Rev C March 2021 Page 37 2021 CommScope Inc Figure 38 IFC Breakout Assemblies ...