7.5
Cut perforated foil into 3 pieces (note orientation) and form over cable. If Flat Drop, wrap around drop. See photos
89-91.
Photo 89
Photo 90
Photo 91
7.6
Place 1 pc of perforated foil between the hose clamp and outer sheath of cable.
7.7
Tighten hose clamp being sure to keep the screw head positioned under the cable retention assembly in order to
avoid interference when installing closure. See photos 92-93.
Photo 92
Photo 93
8
Fiber organizing/storage, routing and splicing
8.1
Mid-sheath.loose.buffer.tube.(LBT)
8.1.1
Route LBT to be spliced to routing tray. See photo 94.
Note:
Left side LBTs to be routed first. Right side LBTs to cross over LBTs from left side. Otherwise, route buffer
tube directly to routing tray.
Photo 94