![CommScope 260103821 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/commscope/260103821/260103821_installation-manual_2643775018.webp)
Page 18 of 37
© 2021 CommScope, Inc. All Rights Reserved
5.2.3.2
Cut strength member(s)
1¾”
from end of sheath openings. See Figure 11.
5.2.3.3 If Flat Drop has a trace wire, cleanly cut away
4”
of wire from end of sheath opening. See photos 62-63.
Photo 62
Photo 63
If cable is shielded and to be grounded proceed to
Section 6,
Cable bonding and grounding.
Proceed to
Section 7
to assemble cable retention hardware to each cable end opening.
5.2.3.4 Separate buffer tube (s) containing fibers to be spliced from LBT bundle.
5.2.3.5
Snap cable retention assemblies into the appropriate locations.
5.2.3.6 Secure with bolt if grounded. See photos 64-65.
Photo
64
Photo
65
5.2.3.7 If all fibers in a LBT are not to be spliced, route LBT to storage area.
Tray stack may be removed for easier access to storage. See photos 66-68.
Photo 66
Photo 67
Photo 68