CQube
SE20 BARISTA
12
Place the machine on a flat horizontal surface that will
support the weight of the machine.
After you have connected all water tubes and
assembled the front and back profiles, push machine
into position according to the picture.
Connect the water hose to the cabinet of the CQube
SE20 machine(A).
Connect the supplied water hose to the cold water
connection using a ½’’ R-connection. When pushing
the machine into position make sure there is no
interference to the hose to ensure proper water
flow.
If the inlet hose is new, flush the system with water
first to remove copper shavings. These can damage
the inlet valve.
The new tube set supplied with the appliance must be
used. Old tubes may not be reused. Connection to a
closable valve is recommended.
Min. water pressure: 2 bar (200kPa).
Max. water pressure: 8 bar (800kPa).
Make sure air is able to circulate behind
the machine (minimum 10cm).
Default temperatures:
Water tank = 96°C, Espresso boiler =98°C, Milk heater 1 = 70°C, Milk heater 2= 65°C
INSTALLATION AND START-UP
Positioning
Machine startup procedure
minimum 10cm
Note
Note
Open the water tap.
Connect the mains cable from CQube SE20 to Barista (B) and mains cable (C) to a earthed wall socket.
Switch on the power switch (D) on the rear of the machine.
The display indicates
Low Water Level
Press Enter Key
Press the
ENTER
button.
The main water tank will now automatically fill with 1.8 litres of water. Simultaneously the espresso water
system will start to fill up. When espresso system is full, some water will be dispensed into the drip tray.
Once the heating is complete, “Low temperature” text will disappear from the display. The icons will be
unlocked and the banner will alternate between “ESPRESSO DRINKS” and “SELECT PRODUCT”.
A
B
B
C
D
Содержание CQube SE20
Страница 1: ...CQUBE SE20 BARISTA USER MANUAL UM_EN Part No 1764020_02 ...
Страница 41: ...CQube SE20 BARISTA 41 DIMENSION SKETCH Model A B C BARISTA 818mm 222mm 456mm Dimensions BARISTA A B C ...
Страница 42: ......
Страница 43: ......