Step 1 -remove chute
Step 2 – remove front cover step Step 3-mark,
disconnect wires
Step 4 note internal knob pos. Step 5- release grinding house Step 6-
remove
grinding house
Step 7- remove the bearing cover Step 8 -remove the shear key Step 9-
remove the disk holder
Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL (804) 435-5522 www.coffeelabequipment.com