CODEL
Page 9
Operation and Maintenance
Issue: A
Revision:
Date: 10/10/18
Ref: 100533
4.4
Optional 24V DC Power Supply Unit (PSU) Installation
Mount the PSU to the mounting surface using 4 M6 bolts (by others). Mounting hole details are
shown in Figure 7 below
Figure 7: Optional PSU mounting Arrangement
Make sure the PSU enclosure is earthed with a grounding strap during installation using
the earthing bolt.
Содержание TunnelTech 601
Страница 2: ...CODEL Page 2 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...
Страница 4: ...CODEL Page 4 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...
Страница 6: ...CODEL Page 6 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...
Страница 8: ...CODEL Page 8 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...