Page 7 

Operation and Maintenance 

Issue: A 

Revision: 

Date: 10/10/18 

Ref: 100533 

 

4.3

 

Cable installation 

 

Before starting any installation, ensure that the power supply Is disconnected.

 

Never under any circumstances make any changes or connection that are not shown in this 
manual.  Improper  use  of  the  appliance  can  cause  serious  hazards,  risking  the  safety  of 
personnel and of the installation. 

The signal output cable connection is made via gland to screw terminals, with a conductor resistance 
of  less  than  10  ohms/km.  the  recommended  cable  to  use  is  armored  Beldon  Type  8771  or  its 
equivalent 

To  open  the  enclosure  to  connect  power  and 
signal output cables, use the Alan keys provided 
to undo the socket head screws and grub screws 
shown in Figure 4 below. 

Once  the  screws  are  released,  slide  the  outer 
enclosure  off  the  inner  section  to  access  the 
boards inside. 

Feed  the  intended  cables  through  the  supplied 
cable glands and once inside the unit connect the 
power cable to the J3 terminal on the 

enclosure’s 

Power Distribution and Heater Control PCB. 

Depending on the voltage requirements of the version supplied a 24VDC PSU may be required. In this 
scenario, connect the +24VDC out to L on the J3 terminal and 0V to N.  

 

Figure 5: Power Distribution and Heater Control PCB 

On 230VAC and 115VAC varieties, ensure to connect a power earth cable to the earth 
terminal on the J3 connector of the Power Distribution Board. 

The earth cable should be about 10mm longer than the other two, so that it will not be 
disconnected accidentally if pulled. 

Connector 

Function 

J1 

Camera power supply (Vout) 

J2 

Heater power supply (Vout) 

J3 

Board Power supply (Vin) 

J4 

Auxiliary output (Vout) to Phot 

J5 

Power supply connector/jumper 

J6 

Fan power supply (Vout) 

Figure 4: enclosure disassembly 

 

Содержание TunnelTech 601

Страница 1: ...10 18 Ref 100533 TunnelTech 601 Luminance Photometer Operation and Maintenance Manual CODEL International Ltd Station Building Station Road Bakewell Derbyshire DE45 1GE United Kingdom t 44 0 1629 814...

Страница 2: ...CODEL Page 2 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...

Страница 3: ...set standards both for itself and for the rest of the industry All development and design work is carried out in house by experienced engineers using proven state of the art CAD and software developm...

Страница 4: ...CODEL Page 4 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...

Страница 5: ...ech 601 1 1 2 Optional accessories 1 2 Principles of Operation 2 3 Specification 3 3 1 Sensor 3 3 2 Housing 4 3 3 Certifications 4 4 Installation 5 4 1 Device Location 5 4 2 Unit Installation 6 4 3 Ca...

Страница 6: ...CODEL Page 6 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...

Страница 7: ...ow are used throughout these instructions and are intended to ensure your safety while carrying out installation operation and maintenance procedures Please read these instructions fully before procee...

Страница 8: ...CODEL Page 8 Operation and Maintenance Issue A Revision Date 10 10 18 Ref 100533...

Страница 9: ...ted at a tunnel approach road and aligned to the tunnel s entrance portal It continuously measures the average luminance within a 20 angle over a standard range of 0 6 500 cd m2 Other ranges available...

Страница 10: ...e photocell is fed into a low noise chopper stabilised amplifier with further stages provide current limiting and gain adjustment before being fed into the 4 20mA output current generator Protection a...

Страница 11: ...20 C to 60 C Dual heater available on request 40 C to 60 C 1 within 50 C from the 25 C calibration temperature Electrical connection requirements 230VAC 50 60Hz 115VAC 50 60Hz 24VAC 50 60Hz 24VDC Ran...

Страница 12: ...ins electrical supply Environment For indoor and outdoor installation Cable glands 3 x M16 Housing window material Glass WxH 94x80mm Bracket Material Extruded aluminium Epoxypolyester powder paint and...

Страница 13: ...om the tunnel entrance is generally accepted at 120 200 metres from the tunnel entrance see CIE publications No 61 1984 and No 88 1990 Mounted 4 5 meters above the road surface to avoid traffic obstru...

Страница 14: ...bracket allows the TunnelTech 601 to be panned through a 360 lateral angle and tilted vertically through 120 The main device housing is attached to the tilt pan bracket via two M6x12mm 10mm hex head b...

Страница 15: ...eased slide the outer enclosure off the inner section to access the boards inside Feed the intended cables through the supplied cable glands and once inside the unit connect the power cable to the J3...

Страница 16: ...ghten the socket head bolts and grub screws Ensure to reconnecting the outer case earth jumper cable to the power distribution PCB if this was removed during the opening of the enclosure for the cable...

Страница 17: ...Power Supply Unit PSU Installation Mount the PSU to the mounting surface using 4 M6 bolts by others Mounting hole details are shown in Figure 7 below Figure 7 Optional PSU mounting Arrangement Make s...

Страница 18: ...automatic Wash Wipe unit is fitted available upon request When cleaning the sensor window avoid ethyl alcohol solvents hydrogenated hydrocarbide strong acids and alkalis Such products may irreparably...

Страница 19: ...0 cd m and therefore the mA output is delivered accordingly and is updated near constantly Each TunnelTech 601 is tested at several points against a traceable standard unit Figure 8 cd m2 to mA output...

Страница 20: ...ure 1 positioning 5 Figure 2 Enclosure Dimensions 6 Figure 3 Bracket dimensions 6 Figure 4 enclosure disassembly 7 Figure 5 Power Distribution and Heater Control PCB 7 Figure 6 Luminance Amp and Curre...

Отзывы: