8 CB RT Installation Instructions
1.0
FOUNDATION - ANCHOR BOLT INSTALLATION INSTRUCTIONS
1.1
Conduit
– Electrical and communication line conduit should be run through the center of the
foun dation hole with a maximum combined diameter of three inches. A minimum of four inches
and a maximum of six inches of conduit is required above the finished grade level. To ensure
proper grounding, a ½-inch x 8-foot copper rod should be inserted in the center of the founda-
tion and tied to the steel enclosure. (Note: Follow all national and local codes governing this
installation.)
1.1
Pour the foundation
– The foundation should be at least 18 inches in diameter and the cor-
rect depth for the frost line in your area, with a minimum depth of at least three feet. (Follow
your local building codes for foundations.)
1.1
Set the anchor bolts in the wet foundation
– Four 24-inch L-shaped anchor bolts and an
aligning template are supplied for anchoring the unit. The bolts should be set into the founda-
tion so that six inches are showing above the finished grade level. The anchor bolts should be
aligned using the supplied template so the faceplate on the unit will face the desired direction.
1.1
Wiring
– Pull power and phone line up through the conduits. A minimum of two feet of wire
must be available from the conduit for electrical and communications wiring.
.
6" MIN STIC K O UT
BO LTS 3/4" X 24"
ELEC TRIC A L AN D COMM UNIC A TIO N CO NDUIT
TO BE DE TERMI NED BY FRO ST LINE
6.00 MIN
10.00
8.00
1.00
6.00
45°
45°
4.25
4.25
BOTTOM VIEW