SET THE UNIT
2.1
Screw one set of nuts and washers onto the anchor bolts
– After the foundation has set,
screw one set of nuts followed by one set of washers onto the anchor bolts. Set the nuts so the
lowest washer is about 2½ inches above the concrete and at an even height. To accomplish
this, use a small level and check all three directions. These nuts are not adjustable after the
unit is in place. The bottom edge of the unit will be ½-inch above the concrete when installed.
IMPORTANT:
The leveling of the bottom nuts is crucial to the leveling of the unit. A small error
will be magnified after installation.
IMPORTANT:
A ½-inch air gap is required between the foundation and the unit. Moisture
problems may result if this condition is not complied with
2.2
Set the unit on the anchor bolts
– Align the faceplate in the desired direction, then lift the unit
over the anchor bolts. Note that the unit weighs approximately 225 pounds. Use appropriate
lifting materi als and methods to avoid possible injury and/or damage.
2.3
Secure the unit
– Access the mounting studs through the door on the side of the unit and
tighten the mounting nuts onto the anchor bolts. This may be more convenient if a long socket,
extension and universal joint is used to tighten the hardware.
3.0
INSTALL COMBINATION BEACON/STROBE
3.1
Gasket
– Place the strobe gasket on top of the enclosure.
3.2
Connect the cords
– Plug the wires from the beacon-strobe into the mating plug at the top
of the enclosure.
3.3
Fasten the beacon/strobe
– Using the supplied screws, fasten the beacon-strobe to the top
of the enclosure.
5.0 WIRING
5.1
Ground
– The ground (green) wire should be stripped and fastened to the supplied grounding
lug.
5.2
24V AC supply
– Using the proper crimping tool, attach a #8 fork to each of the incoming
power wires and fasten them to the terminal screws labeled “24V AC.”
5.3
120/240V AC supply
– Using the proper crimping tool, attach a #8 fork to each of the incom-
ing power wires and fasten them to the correct terminals as labeled on the transformer. After
completing the wire connections, install the supplied terminal covers.
All wiring must be installed and connected by experienced and certified personnel to meet
local and national electrical codes, and will include a service disconnect.