CNI QCM486 Скачать руководство пользователя страница 11

QCM486 Miniature Protector Connector (MPC) 

- 11 –

  

comtestnetworks.com

 

11.5

 

Unpack the MPC, remove protective 

material, and mount the MPC on the 

adapter. Tighten thumbscrews to secure the 

MPC on the adapter. 

11.6

 

Loosen the locking thumbscrews, swing 

the MPC full left, and lock in position. 

11.7

 

Remove the plastic cover from the 

protector terminal field by removing the 

retaining screw. 

11.8

 

Unlock the adapter, switch the MPC 

full right, and lock in position. 

11.9

 

Push the four 25-pair groups through 

the four slots in the MPC mounting bracket; 

the group with pair-count 1-25 must be in 

the top slot followed by pair-counts 26-50, 

51-75, and 76-100 in the other slots in

descending order. Remove any slack by

reaching around the MPC and pulling and

pushing the wires into the protector terminal

field.

11.10

 

At the rear of the connector,

bring groups 1-25 and 26-50 together, and

secure them to the cable mounting stud on

the MPC mounting bracket using a cable tie.

Repeat for groups 51-75 and 76-100.

11.11

 

Lace the two 50-pair groups

from the rear tie wraps on the MPC to the

first transverse arm below the MPC.

11.12

 

Unlock the adapter, swing the

MPC full left, and lock in position.

11.13

 

Using standard wire-wrap

tools, procedures and the wiring diagram in

Figure 10, terminate the cable pairs on the

long-pin terminals of the protector terminal

field.

11.14

 

Dress all wires on protector

field, and replace the cover over protector

terminals.

11.15

 

Unlock the adapter, swing the

MPC to center position.

11.16

 

Loosen, but do not remove,

the screws securing the adapter to the frame

vertical and the thumbscrews securing the

MPC to the adapter.

11.17

 

Lift adapter and MPC off the

frame vertical, and remove the adapter from

the MPC mounting bracket.

11 .18 

Hang the MPC by its mounting 

bracket slots on the two screws in the frame 

vertical. Tighten the screws. 

NOTE: 

Mount the first MPC on the appropriate 

frame verticals (Figure 9): 

• Compact (PDF) 356 mm (14 in.) from floor or

203 mm (8 in.) from ladder guard rail.

• Conventional (PDF) 305 mm (12 in.) from

floor (Figure 6).

NOTE: 

Position the MPC so that the plastic stud 

on the top of the connector immediately below 

engages the slot on the bottom of the connector being 

mounted. 

11.19 

Dress the binders down the frame, and

tie to the transverse arms as required.

Содержание QCM486

Страница 1: ...ies that are sold separately or to request installation information if necessary 2 Description 2 1 The QCM486 Miniature Protector Connector MPC Figure 1 is a 100 pair connector for terminating and protecting cable pairs in Central Offices CO and customer premises 2 2 The MPC provides Voltage protection or voltage current protection on cable pairs Direct feed facility between outside plant cable pa...

Страница 2: ... clearances for rolling ladder and the MPC is approximately 51 mm 2 in NOTE If this measurement is not met contact theCentralOfficeEngineeringGroupforcorrection prior to mounting MPC units 3 2 Where distributing frame verticals are not drilled to fit MPC 140 mm 5 5 in mounting centers replace verticals drill as required or install a mounting bar kit 3 3 The following precautions are included per r...

Страница 3: ...provide the following connections and terminations Tip T and Ring R conductor terminations for one outside plant cable pair and parallel connection to equivalent test field pair through the two long pins on the base T and R conductor connections to one CO cross connect terminal pair through the two short pins on the base Ground connection to MPC housing through spring contacts on the side of prote...

Страница 4: ...he protector side Wire wrap terminals on the other side terminate the Tip and Ring of one CO pair through internal wiring from the corresponding pair of contacts on the cross connect field 5 6 When the protector unit is withdrawn to the detent position the short pins on the protector unit break contact with the receptacle pins opening the circuit between CO and outside plant cable pairs The long p...

Страница 5: ...inst the right side of the vertical with the short bend of the mounting bar located to the left Figure 5 6 5 Fasten mounting bar to vertical using the screws provided Leave 75 mm 3 in between the mounting bar and the guard rail at the bottom of the frame Insert screws from right through the 50 mm 2 in slots in the mounting bar into the existing holes in verticals Position screws at top center and ...

Страница 6: ...r nonstandard height frame Cut as required remove burrs and paint end 6 8 Connect a ground strap between the top mounting slot of each mounting bar and the bottom mounting slot of the bar above Figure 5 6 9 Using flexible ground strap and clamp plate connect the mounting bar kit to the ground bar of frame Figure 6 NOTE When free mounting holes are not available on the ground bar use the existing n...

Страница 7: ...QCM486 Miniature Protector Connector MPC 7 comtestnetworks com 7 Recommended Distributing Frame Capacities ...

Страница 8: ...racket slots on the two screws in the frame vertical Figures 8 and 9 NOTE Mount the first MPC on the appropriate frame verticals Compact PDF 356 mm 14 in from floor or 203 mm 8 in from ladder guard rail Figure 7 Conventional PDF 305 mm 12 in from floor Figure 7 NOTE Position the MPC so that the plastic stud on the top of the connector immediately below engages the slot on the bottom of the connect...

Страница 9: ...F 356 mm 14 in from floor or 203 mm 8 in from ladder guard rail Figure 7 Conventional PDF 305 mm 12 in from floor Figure 7 NOTE Position the MPC so that the plastic stud on the top of the connector immediately below engages the slot on the bottom of the connector being mounted 9 7 Tighten screws to secure the MPC to the vertical 9 8 Dress the stub up or down the distributing frame 9 9 Mark the MPC...

Страница 10: ...e connector being mounted 10 7 Tighten screws to secure MPC to the vertical 10 8 Dress one of the stubs to the distribution frame and then dress the second stub 10 9 Mark the MPC designation strip with the number and pair count of the cable being terminated 10 10 Test the protector modules NOTE Splice stubs to the main cable as required by the job specification using standard splicing procedures f...

Страница 11: ...r tie wraps on the MPC to the first transverse arm below the MPC 11 12 Unlock the adapter swing the MPC full left and lock in position 11 13 Using standard wire wrap tools procedures and the wiring diagram in Figure 10 terminate the cable pairs on the long pin terminals of the protector terminal field 11 14 Dress all wires on protector field and replace the cover over protector terminals 11 15 Unl...

Страница 12: ...Figure 10 1 5 6 10 11 15 through 96 00 100 Use of p n QCM31A test connector or other standard test equipment is recommended to test connections Test connector p n QCM31A fits into the top and bottom slots on the test field and has locating pins which mate with holes on the field to ensure proper alignment NOTE For MPC dual stubs test field for this is not connected ...

Страница 13: ...o rear slot 13 1 3 Terminate cross connect wire on the applicable quick clip terminals on the cross connect field NOTE The A0276558 termination removal tool must be used on quick clip terminals 13 1 4 Dress cross connect wire in the channels on the cross connect field between front and rear fanning strips and on the distributing frame 13 2 Removal NOTE Whendisconnectingwiresonthecross connect fiel...

Отзывы: