Operating instruction
High-Z T-Series
Siemensstrasse 13-15
D-47608 Geldern Tel. +49 (0)2831/91021-20
Page 70
15.02.2014
9.3.2
Check axes for perpendicularity
Personnel:
Qualified personnel
Safety equipment:
protective clothing
Safety shoes
1 Check the Y-axis to the X axis on squareness, where
necessary, re-align using the operation description for
aligning the machine regarding perpendicularity (see
page 67 / 9.3.3)
5 Start reference run with zero-point approach; see
separate instructions of the software.
9.3.3
Description of process for aligning the machine with respect to
perpendicularity.
Requirements: A complete structure of the portal system, including controller, PC and
software.
Using the control software of the machine (X-axis) drive against the movable bearing
brackets of the X-axis (see page 29) by manual, slow speed and stop for a short time(max.
5 mm / s). Thereby the two stepper motor drives of the X-axis are synchronized, and the Y-
bridge with the X-axis is aligned at right angles. After this procedure, retract the Y-Bridge by
about 30mm from the stop blocks (depending on the position of the magnet holder of the
X-axis) and then initiate a reference run. The machine is ready for operation.
HINT:
Property damage caused by non-observance of perpendicularity!
Ignoring the perpendicularity can cause considerable damage to the
mechanics.
HINT:
If in doubt please contact the customer service "customer service" on page
7.